File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
04511667 |
APPLICATION FINALISED |
PERMISSION |
C |
04/11/2004 Thursday |
Anglo American Lisheen Mining Ltd |
Ballyerk, Derryville & Killoran Moyne |
extension to existing mine and construction of 3 No. ventilation shafts, two of which have evases and the third a hoist house. An EIS has been submitted with this application. |
06510773 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2006 Wednesday |
Anglo American Lisheen Mining Ltd., |
Barnalisheen, Cooleeny, Derryfada, Derryville and Killoran |
wind turbine farm consisting of 22 No. wind turbine generators, access roads, craneage pads and associated infrastructure. An Environmental Impact Statement will be submitted to the Planning Authority with this Application |
08511188 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
22/12/2008 Monday |
SWS Energy Ltd |
Kiloran Moyne Cooleeny |
1 no. meteorological mast of 61.5m in height (pl ref 03/51/1001) for the limited purpose of monitoring wind and climate conditions for development referenced in planning application 06/51/0773 |
12510275 |
APPLICATION FINALISED |
PERMISSION |
C |
27/07/2012 Friday |
Bord na Mona Energy Ltd., |
Killoran Thurles Co. Tipperary |
extension to the existing Lisheen substation including the construction of a new control building, transformer bay, transformer/transformer bund, 38kV cubicle and the extension of the existing 110kV busbar. Ancillary works to include the realignment of the internal mine access track to facilitate the proposed extension and the erection of a new compound palisade fence to secure the extension |
13510275 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2013 Thursday |
Lisheen Milling Limited |
Killoran Thurles Co. Tipperary |
consisting of modification of the permitted water impoundment facility (permitted under An Bord Pleanala Ref. No. PL22.100093 (North Tipperary County Council Reg. Ref. PLC17663) including use of the facility to provide for the storage and management of mine tailings within the same structure (for the purposes of extending life of mine), and associated capping and reinstatement activities. The proposed development also includes: the installation of spigots and reclaim pumps; and all other ancillary site development works. An Environmental Impact Statement (EIS) and Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the Planning Application. The application relates to development which comprises, or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence under the Environmental Protection Agency Acts, 1992 to 2013 (EPA Licence Reg. No. P0088-03) |
14510138 |
APPLICATION FINALISED |
PERMISSION |
C |
02/05/2014 Friday |
SWS Energy Limited |
Killoran Templetuohy Co. Tipperary |
underground electrical and communication cables, linking the 8 no. proposed turbines, within Counties Laois and Kilkenny and described hereunder, to the substation and control building at the existing 110kV Lisheen Sub-Station and construction of approximately 1.3km of new internal site access tracks. A ten-year permission is sought. The application is accompanied by an Environmental Impact Statement and Natura Impact Statement. The development is part of a larger development and the site also extends into the townlands of Baunmore, Bruckana and Rathpatrick near Johnstown, Co. Kilkenny and Graigueadrisly, Co. Laois |
14600396 |
APPLICATION FINALISED |
PERMISSION |
C |
29/10/2014 Wednesday |
Lisheen Milling Limited |
Killoran Moyne, Thurles Co. Tipperary |
an increase in height of the existing Tailings Management Facility (TMF), previously permitted under Reg. No. 13/510275, granted in 2013 (small adjoining cell to the main TMF). The raise in height of this adjoining cell, from c. 131.5 mod up to aa maximum of c. 136.5 mod, will provide additional storage for the management of mine tailings for the purposes of extending the life of the mine, abd will result in an increase in the footprint of the TMF of c 2.25 hectares. The development also includes all related ancillary development works. This application is accompanied by an Environmental Impact Statement(EIS) & Natura Impact Statement(NIS) and relates to an activity requiring an Integrated Pollution Control Licence |
15600924 |
APPLICATION FINALISED |
PERMISSION |
C |
23/10/2015 Friday |
Brookfield Renewable Ireland Limited |
Killoran Templetuohy Co. Tipperary |
The development will consist of alterations to a previously permitted wind farm development (Planning Register References 14/510138 (Tipperary), 14/202 (Kilkenny) and 14/109 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick near Johnstown, County Kilkenny and Graigueadrisly, County Laois. The proposed alterations will consist of:
Amended cable route for underground electrical and communication cables; the omission of 1.3 km of previously permitted access track in Tipperary; and all associated works and services. A ten-year permission is sought. The application is accompanied by a Natura Impact Statement. This current application is part of an application for development which extends into the townlands of Bruckana and
Baunmore near Johnstown, County Kilkenny The proposed amendments will
consist of: relocated vehicular entrance on R502 through widening existing
agricultural entrance; alterations to internal access tracks including construction
of approximately 572m of new access track with associated drainage and
watercourse crossing; the omission of 1.775 km of previously permitted access
tracks; Clearfelling of approximately 0.5 Hectares of forestry associated with the
new section of internal access track within the Baunmore forestry plantation,
County Kilkenny; Amended cable route for underground electrical and communication cables; and all associated works and services. A ten-year
permission is sought. The application is accompanied by a Natura Impact
Statement |
17600440 |
APPLICATION FINALISED |
PERMISSION |
C |
26/04/2017 Wednesday |
Commercial Mushroom Producers Co-operative Society Ltd |
Killoran Moyne Thurles |
the development will consist of a Phase III mushroom substrate (compost) production facility and will involve the construction of an administration building (296.16 sq. m), storage building (8444.04 sq. m), bunker building (9967.59 sq. m), tunnel building (10628.75 sq. m), woodchip bio-filter, wheelwash, weighbridge, 6 no. water storage tanks, 2 no. fuel storage tanks, well, wastewater treatment system, hardstanding areas, internal access roads, parking facilities, boundary fencing, landscaping, and all ancillary works. An Environmental Impact Statement (EIS) will be submitted with the planning application. The application relates to development which comprises or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence or a Waste Licence |
18601265 |
INCOMPLETED APPLICATION |
PERMISSION |
|
22/10/2018 Monday |
Glanbia Ireland DAC |
Killoran Moyne Thurles |
a biorefinery facility comprising of a process building with processing areas, plant rooms, stores, personnel & administrative areas; external bunded process & storage areas; vessels and tanks; CHP plant; an effluent & water treatment plant which includes bunded tanks & a building;sewage treatment plant; water storage tanks & site development works including demolition of an existing electrical building, roads, paved areas, parking areas, drains and services, bore well, lighting, fire water retention tank, attenuation pond, site fencing, alterations to the discharge pipeline from the sewage treatment plant, weighbridges & weighbridge office, connection to an existing outfall pipeline and landscaping works. The application is accompanied by an Environmental Impact Assessment Report. This application relates to development which comprises or is for the purpose of an activity requiring an Integrated Pollution Prevention and Control Licence |
18601296 |
APPLICATION FINALISED |
PERMISSION |
C |
26/10/2018 Friday |
Glanbia Ireland DAC |
Killoran Moyne Thurles |
a biorefinery facility comprising of a process building with processing areas, plant rooms, stores, personnel & administrative areas; external bunded process & storage areas; vessels and tanks; CHP plant; an effluent & water treatment plant which includes bunded tanks & a building;sewage treatment plant; water storage tanks & site development works including demolition of an existing electrical building, roads, paved areas, parking areas, drains and services, bore well, lighting, fire water retention tank, attenuation pond, site fencing, alterations to the discharge pipeline from the sewage treatment plant, weighbridges & weighbridge office, connection to an existing outfall pipeline and landscaping works. The application is accompanied by an Environmental Impact Assessment Report. This application relates to development which comprises or is for the purpose of an activity requiring an Integrated Pollution Prevention and Control Licence |
21825 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
08/06/2021 Tuesday |
Seamus O'Dwyer |
Cloghonan Templederry Nenagh |
a dormer dwellinghouse, road entrance, septic tank and percolation area to EPA Guidelines 2009 and all ancillary site works |
21855 |
APPLICATION FINALISED |
PERMISSION |
C |
11/06/2021 Friday |
Lisheen III Wind Farm Ltd. |
Killoran near Templetuohy Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cabling previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and all associated works and services |
211057 |
INCOMPLETED APPLICATION |
PERMISSION |
|
21/07/2021 Wednesday |
Soleirtricity Lisheen Ltd. |
DerryFadda Cooleeny Killoran |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works. The total development area will be ca. 77ha. |
51565 |
APPLICATION FINALISED |
PERMISSION |
C |
31/10/1966 Monday |
DENIS BOURKE |
COOLKENNEDY THURLES
|
ERECTION OF BUNGALOW |