Planning Application: 17600440 (Tipperary County Council )
File Number:
17600440
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
26/04/2017
Decision Due Date:
23/01/2018
Validated Date:
26/04/2017
Invalidated Date:
Further Info Requested:
19/06/2017
Further Info Received:
20/11/2017
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
23/01/2018
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Commercial Mushroom Producers Co-operative Society Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the development will consist of a Phase III mushroom substrate (compost) production facility and will involve the construction of an administration building (296.16 sq. m), storage building (8444.04 sq. m), bunker building (9967.59 sq. m), tunnel building (10628.75 sq. m), woodchip bio-filter, wheelwash, weighbridge, 6 no. water storage tanks, 2 no. fuel storage tanks, well, wastewater treatment system, hardstanding areas, internal access roads, parking facilities, boundary fencing, landscaping, and all ancillary works. An Environmental Impact Statement (EIS) will be submitted with the planning application. The application relates to development which comprises or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence or a Waste Licence
Development Address:
Killoran, Moyne, Thurles, Co. Tipperary
Architect Name:
Location Key:
KILLORAN, MOYNE, THURLES
Electoral Division:
Planner:
ANNE MARIE DEVANEY
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Yes
Waste Licence Required:
Yes
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
23/01/2018
Manager Order:
Decision Type:
Conditional
Number of Conditions:
12
Grant Date:
27/02/2018
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
26/02/2023
Decision Description:
the development will consist of a Phase III mushroom substrate (compost) production facility and will involve the construction of an administration building (296.16 sq. m), storage building (8444.04 sq. m), bunker building (9967.59 sq. m), tunnel building (10628.75 sq. m), woodchip bio-filter, wheelwash, weighbridge, 6 no. water storage tanks, 2 no. fuel storage tanks, well, wastewater treatment system, hardstanding areas, internal access roads, parking facilities, boundary fencing, landscaping, and all ancillary works. An Environmental Impact Statement (EIS) will be submitted with the planning application. The application relates to development which comprises or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence or a Waste Licence
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha.
Former Lisheen Mine Site Killoran, Moyne Thurles, Co. Tipperary
construction of an anaerobic digestion plant comprising: 4 no. primary digester tanks (each measuring c. 7.6 m in height); 3 no. secondary digester tanks (each measuring c. 14.5 m in height); 4 no. feed hoppers; 4 no. technical rooms (ranging in size from c. 35 sq m to c. 95 sq m GFA); 2 no. biogas conditioning units; process, storage and buffer tanks (comprising: 1 no. buffer digestate storage tank (c. 7.5 m in height), 1 no. suspension buffer tank (c. 8 m in height), 1 no. process area runoff storage tank (c. 4.5 m in height); 1 no. buffer digestate process tank (c. 4.5 m in height), 1 no. treated digestate liquids recycle storage tank (c. 4.5 m in height); 1
no. roofed liquids feed-mix tank (c. 3 m in height)); these components will be located within a containment bund constructed c. 3 m below ground level.
The proposed development will also consist of: feedstock storage (comprising 3 no. storage clamps (c. 1,050 sq m in area each) and 2 no. storage sheds (c. 500 sq m GFA each)); a biomethane upgrading plant (including natural gas compression unit); a biomethane loading facility (comprising 4 no. loading bays with associated gates and safety features measuring c. 490 sq m in area); a biomass boiler with its associated pellet storage silo (c. 12.5 m in height); Combined Heat and Power (CHP) plant and associated heat exchanger; a single storey bio-based fertiliser processing and storage unit (c. 3,890 sq m GFA) (including digestate dewatering plant, fertiliser pasteurisation plant and bio-based fertiliser loading facilities); a single storey office building (c. 105 sq m GFA) (including offices, meeting room, control room, laboratory, welfare facilities, storeroom and a first-aid facility); bin storage; 9 no. car parking spaces (including 5 no. standard parking spaces, 2 no. electric vehicle (EV) spaces and 1 no. accessible car parking space); electric vehicle (EV) charging infrastructure; 10 no. bicycle parking spaces; vehicular, cyclist and pedestrian access / egress and associated circulation routes; 2 no. weighbridges; a vehicle steam wash area; fuel storage tank and associated bund; an emergency flare (c. 7.6 m in height); a process area runoff lagoon; an attenuation pond; an ESB sub-station; boundary treatments [including gates, piers and fencing]; site lighting; all hard and soft landscaping; provision of sustainable urban drainage systems (SUDS); and all other associated site excavation, infrastructural and all other associated site excavation, infrastructural and site development works above and below ground, including changes in level and associated retaining features, and associated site servicing [water and electricity supply]. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted with the application