06510773 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2006 Wednesday |
Anglo American Lisheen Mining Ltd., |
Barnalisheen, Cooleeny, Derryfada, Derryville and Killoran |
wind turbine farm consisting of 22 No. wind turbine generators, access roads, craneage pads and associated infrastructure. An Environmental Impact Statement will be submitted to the Planning Authority with this Application |
12510275 |
APPLICATION FINALISED |
PERMISSION |
C |
27/07/2012 Friday |
Bord na Mona Energy Ltd., |
Killoran Thurles Co. Tipperary |
extension to the existing Lisheen substation including the construction of a new control building, transformer bay, transformer/transformer bund, 38kV cubicle and the extension of the existing 110kV busbar. Ancillary works to include the realignment of the internal mine access track to facilitate the proposed extension and the erection of a new compound palisade fence to secure the extension |
14510138 |
APPLICATION FINALISED |
PERMISSION |
C |
02/05/2014 Friday |
SWS Energy Limited |
Killoran Templetuohy Co. Tipperary |
underground electrical and communication cables, linking the 8 no. proposed turbines, within Counties Laois and Kilkenny and described hereunder, to the substation and control building at the existing 110kV Lisheen Sub-Station and construction of approximately 1.3km of new internal site access tracks. A ten-year permission is sought. The application is accompanied by an Environmental Impact Statement and Natura Impact Statement. The development is part of a larger development and the site also extends into the townlands of Baunmore, Bruckana and Rathpatrick near Johnstown, Co. Kilkenny and Graigueadrisly, Co. Laois |
15600924 |
APPLICATION FINALISED |
PERMISSION |
C |
23/10/2015 Friday |
Brookfield Renewable Ireland Limited |
Killoran Templetuohy Co. Tipperary |
The development will consist of alterations to a previously permitted wind farm development (Planning Register References 14/510138 (Tipperary), 14/202 (Kilkenny) and 14/109 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick near Johnstown, County Kilkenny and Graigueadrisly, County Laois. The proposed alterations will consist of:
Amended cable route for underground electrical and communication cables; the omission of 1.3 km of previously permitted access track in Tipperary; and all associated works and services. A ten-year permission is sought. The application is accompanied by a Natura Impact Statement. This current application is part of an application for development which extends into the townlands of Bruckana and
Baunmore near Johnstown, County Kilkenny The proposed amendments will
consist of: relocated vehicular entrance on R502 through widening existing
agricultural entrance; alterations to internal access tracks including construction
of approximately 572m of new access track with associated drainage and
watercourse crossing; the omission of 1.775 km of previously permitted access
tracks; Clearfelling of approximately 0.5 Hectares of forestry associated with the
new section of internal access track within the Baunmore forestry plantation,
County Kilkenny; Amended cable route for underground electrical and communication cables; and all associated works and services. A ten-year
permission is sought. The application is accompanied by a Natura Impact
Statement |
20129 |
APPLICATION FINALISED |
PERMISSION |
C |
13/02/2020 Thursday |
Glanbia Ireland DAC |
Cooleeny, Derryfadda, Derryville and Killoran Moyne Thurles |
a 10 year planning permission for modifications to Condition No. 1 of previously granted planning permission Ref. No. 18/601296. The modifications comprise an outfall drain and associated pumping station and monitoring chambers to discharge surface water and treated waste water from the Biorefinery site through the townlands of Cooleeny and Derryfadda to the Drish River; a water supply pumphouse and associated site works including access road and security fencing in the townland of Derryville and a water supply pipeline from the pumphouse to the Biorefinery facility site. A Natura Impact Statement (NIS) will accompany the application. This application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence. |
21565 |
INCOMPLETED APPLICATION |
PERMISSION |
|
27/04/2021 Tuesday |
Lisheen III Wind Farm Ltd. |
Killoran near Templetuohy Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cable previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and all associated works and services |
211128 |
APPLICATION FINALISED |
PERMISSION |
C |
30/07/2021 Friday |
Soleirtricity Lisheen Ltd. |
Cooleeny Derryfadda and Killoran Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha. |