File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
03511001 |
APPLICATION FINALISED |
PERMISSION |
C |
19/09/2003 Friday |
Anglo American Lisheen Mining Ltd |
Killoran Moyne Thurles |
erect a 61.5m high mast of galvanised tubular steel construction to measure and record wind speed and direction at the existing Mine site |
04511667 |
APPLICATION FINALISED |
PERMISSION |
C |
04/11/2004 Thursday |
Anglo American Lisheen Mining Ltd |
Ballyerk, Derryville & Killoran Moyne |
extension to existing mine and construction of 3 No. ventilation shafts, two of which have evases and the third a hoist house. An EIS has been submitted with this application. |
06510773 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2006 Wednesday |
Anglo American Lisheen Mining Ltd., |
Barnalisheen, Cooleeny, Derryfada, Derryville and Killoran |
wind turbine farm consisting of 22 No. wind turbine generators, access roads, craneage pads and associated infrastructure. An Environmental Impact Statement will be submitted to the Planning Authority with this Application |
08511188 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
22/12/2008 Monday |
SWS Energy Ltd |
Kiloran Moyne Cooleeny |
1 no. meteorological mast of 61.5m in height (pl ref 03/51/1001) for the limited purpose of monitoring wind and climate conditions for development referenced in planning application 06/51/0773 |
09510142 |
APPLICATION FINALISED |
PERMISSION |
C |
18/03/2009 Wednesday |
SWS Energy Ltd., |
Kiloran Cooleeny Moyne |
erect one no. permanent meteorological mast of 95 metres in height with internal access road to be utilised for the limited purpose of monitoring wind and climate conditions for the development referenced in North Tipperary County Council Pl. Ref. 06510773 and ABP PL 22.222142 |
13510275 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2013 Thursday |
Lisheen Milling Limited |
Killoran Thurles Co. Tipperary |
consisting of modification of the permitted water impoundment facility (permitted under An Bord Pleanala Ref. No. PL22.100093 (North Tipperary County Council Reg. Ref. PLC17663) including use of the facility to provide for the storage and management of mine tailings within the same structure (for the purposes of extending life of mine), and associated capping and reinstatement activities. The proposed development also includes: the installation of spigots and reclaim pumps; and all other ancillary site development works. An Environmental Impact Statement (EIS) and Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the Planning Application. The application relates to development which comprises, or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence under the Environmental Protection Agency Acts, 1992 to 2013 (EPA Licence Reg. No. P0088-03) |
14510132 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
28/04/2014 Monday |
William & Therese Ryan |
Drom Templemore Co Tipperary |
to erect two storey dwelling house, garage/shed, create new entrance, install waste water treatment system, together wtih associated site works - ref 08/51/1198 |
15600924 |
APPLICATION FINALISED |
PERMISSION |
C |
23/10/2015 Friday |
Brookfield Renewable Ireland Limited |
Killoran Templetuohy Co. Tipperary |
The development will consist of alterations to a previously permitted wind farm development (Planning Register References 14/510138 (Tipperary), 14/202 (Kilkenny) and 14/109 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick near Johnstown, County Kilkenny and Graigueadrisly, County Laois. The proposed alterations will consist of:
Amended cable route for underground electrical and communication cables; the omission of 1.3 km of previously permitted access track in Tipperary; and all associated works and services. A ten-year permission is sought. The application is accompanied by a Natura Impact Statement. This current application is part of an application for development which extends into the townlands of Bruckana and
Baunmore near Johnstown, County Kilkenny The proposed amendments will
consist of: relocated vehicular entrance on R502 through widening existing
agricultural entrance; alterations to internal access tracks including construction
of approximately 572m of new access track with associated drainage and
watercourse crossing; the omission of 1.775 km of previously permitted access
tracks; Clearfelling of approximately 0.5 Hectares of forestry associated with the
new section of internal access track within the Baunmore forestry plantation,
County Kilkenny; Amended cable route for underground electrical and communication cables; and all associated works and services. A ten-year
permission is sought. The application is accompanied by a Natura Impact
Statement |
20825 |
APPLICATION FINALISED |
PERMISSION |
C |
28/07/2020 Tuesday |
Lisheen III Wind Farm Ltd |
Killoran Templetuohy Co Tipperary |
works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; installation of electrical infrastructure; and underground cable connection from the electrical infrastructure to the existing substation control building. The application is accompanied by a Planning and Environmental Report and Appropriate Assessment Screening Report |
21565 |
INCOMPLETED APPLICATION |
PERMISSION |
|
27/04/2021 Tuesday |
Lisheen III Wind Farm Ltd. |
Killoran near Templetuohy Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cable previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and all associated works and services |
21855 |
APPLICATION FINALISED |
PERMISSION |
C |
11/06/2021 Friday |
Lisheen III Wind Farm Ltd. |
Killoran near Templetuohy Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cabling previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and all associated works and services |
211128 |
APPLICATION FINALISED |
PERMISSION |
C |
30/07/2021 Friday |
Soleirtricity Lisheen Ltd. |
Cooleeny Derryfadda and Killoran Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha. |