File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
04511667 |
APPLICATION FINALISED |
PERMISSION |
C |
04/11/2004 Thursday |
Anglo American Lisheen Mining Ltd |
Ballyerk, Derryville & Killoran Moyne |
extension to existing mine and construction of 3 No. ventilation shafts, two of which have evases and the third a hoist house. An EIS has been submitted with this application. |
06510773 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2006 Wednesday |
Anglo American Lisheen Mining Ltd., |
Barnalisheen, Cooleeny, Derryfada, Derryville and Killoran |
wind turbine farm consisting of 22 No. wind turbine generators, access roads, craneage pads and associated infrastructure. An Environmental Impact Statement will be submitted to the Planning Authority with this Application |
10510118 |
APPLICATION FINALISED |
PERMISSION |
C |
25/03/2010 Thursday |
Bord na Mona Energy Ltd., |
Killoran & Tullowmacjames Templetuohy Co. Tipperary |
four wind turbines of up to 100m hub height and up to 112m rotor diameter with a total height not exceeding 156m; a transformer and crane hardstand area at each turbine; underground electrical and communication cables linking the turbines; internal site tracks; drainage works; a section of the proposed 38kV overhead power line from the proposed 38kV substation in Bruckana to the 110kV Lisheen substation; and associated works. This development is part of a larger development which extends to parts of County Laois (townland of Baunaghra) and County Kilkenny (townlands of Bruckana, Rathpatrick and Baunmore). The development as a whole will consist of a wind farm comprising: sixteen wind turbines of up to 100m hub height and up to 112m rotor diameter with a total height not exceeding 156m; a transformer and crane hardstanding area at each turbine; underground electrical and communication cables linking the turbines; internal site tracks; a permanent meteorological lattice mast 100m high; drainage works; a 38 kV substation and associated equipment and control building with associated septic tank and treatment system; a 38 kV overhead line to the 110 kV Lisheen substation; and associated works. An Environmental Impact Assessment accompanies the application. The development is proposed on a site that is the subject of an integrated Pollution Control Licence (Reg. No. 499) as issued by the EPA in accordance with the provisions of the Environmental Protection Agency Act, 1992 |
12510275 |
APPLICATION FINALISED |
PERMISSION |
C |
27/07/2012 Friday |
Bord na Mona Energy Ltd., |
Killoran Thurles Co. Tipperary |
extension to the existing Lisheen substation including the construction of a new control building, transformer bay, transformer/transformer bund, 38kV cubicle and the extension of the existing 110kV busbar. Ancillary works to include the realignment of the internal mine access track to facilitate the proposed extension and the erection of a new compound palisade fence to secure the extension |
13510275 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2013 Thursday |
Lisheen Milling Limited |
Killoran Thurles Co. Tipperary |
consisting of modification of the permitted water impoundment facility (permitted under An Bord Pleanala Ref. No. PL22.100093 (North Tipperary County Council Reg. Ref. PLC17663) including use of the facility to provide for the storage and management of mine tailings within the same structure (for the purposes of extending life of mine), and associated capping and reinstatement activities. The proposed development also includes: the installation of spigots and reclaim pumps; and all other ancillary site development works. An Environmental Impact Statement (EIS) and Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the Planning Application. The application relates to development which comprises, or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence under the Environmental Protection Agency Acts, 1992 to 2013 (EPA Licence Reg. No. P0088-03) |
14510138 |
APPLICATION FINALISED |
PERMISSION |
C |
02/05/2014 Friday |
SWS Energy Limited |
Killoran Templetuohy Co. Tipperary |
underground electrical and communication cables, linking the 8 no. proposed turbines, within Counties Laois and Kilkenny and described hereunder, to the substation and control building at the existing 110kV Lisheen Sub-Station and construction of approximately 1.3km of new internal site access tracks. A ten-year permission is sought. The application is accompanied by an Environmental Impact Statement and Natura Impact Statement. The development is part of a larger development and the site also extends into the townlands of Baunmore, Bruckana and Rathpatrick near Johnstown, Co. Kilkenny and Graigueadrisly, Co. Laois |
20825 |
APPLICATION FINALISED |
PERMISSION |
C |
28/07/2020 Tuesday |
Lisheen III Wind Farm Ltd |
Killoran Templetuohy Co Tipperary |
works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; installation of electrical infrastructure; and underground cable connection from the electrical infrastructure to the existing substation control building. The application is accompanied by a Planning and Environmental Report and Appropriate Assessment Screening Report |
21565 |
INCOMPLETED APPLICATION |
PERMISSION |
|
27/04/2021 Tuesday |
Lisheen III Wind Farm Ltd. |
Killoran near Templetuohy Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cable previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and all associated works and services |
21855 |
APPLICATION FINALISED |
PERMISSION |
C |
11/06/2021 Friday |
Lisheen III Wind Farm Ltd. |
Killoran near Templetuohy Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cabling previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and all associated works and services |
211128 |
APPLICATION FINALISED |
PERMISSION |
C |
30/07/2021 Friday |
Soleirtricity Lisheen Ltd. |
Cooleeny Derryfadda and Killoran Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha. |