File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
1160138 |
APPLICATION FINALISED |
PERMISSION |
R |
03/06/2011 Friday |
KAROL MCELHINNEY |
AGHAVEAGH BALLYBOFEY |
CONSTRUCTION OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL PROVIDE FOR THE ERECTION OF A RECEPTION SHED WITH MIXING AND RECEPTION TANKS AND PLANT ROOM, A BUFFER TANK, CHP ELECTRICAL ROOMS, A DIGESTER AND SECONDARY DIGESTER TANK WITH A CO-JOINING PUMPROOM AND A STORAGE TANK |
1260039 |
APPLICATION FINALISED |
PERMISSION |
C |
28/02/2012 Tuesday |
KAROL MCELHINNEY |
AGHAVEAGH BALLYBOFEY |
CONSTRUCTION OF THE FOLLOWING (1) 4 NO. AGRICULTURAL SLATTED SHEDS (2) 1 NO DRY SHED FOR STORAGE OF GRAIN AND MACHINERY (3) 1 NO. CONCRETE SILAGE PIT (4) 1 nO. ROOFED DUNGSTEAD (5) ASSOCIATED SITE DEVELOPMENT WORKS DRAINAGE AND CONCRETE APRONS |
1350869 |
APPLICATION FINALISED |
PERMISSION |
C |
01/07/2013 Monday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF A PRIMARY AND SECONDARY DIGESTER WITH COLLECTION DOME, A CO - JOINING PUMP ROOM, SEPARATE DIGESTATE STORAGE TANK WITH COLLECTION DOME, SEPARATE SLURRY STORAGE TANK WITH COLLECTION DOME AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING: TWO FEED HOPPERS, PRE PIT, CHP BUILDING, ELECTRICAL SUBSTATION, FLARE AND BIOGAS BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE WORKS |
1351470 |
INCOMPLETED APPLICATION |
PERMISSION |
|
18/11/2013 Monday |
GLENMORE ESTATE AGHAVEAGH NW LTD |
AGHAVEAGH BALLYBOFEY LIFFORD PO |
COMMERCIAL CENTRALISED ANEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF ANEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING:TWO FEED HOPPERS, PRE PIT,CHP BUILDING, GAS COMPRESSION & CO2 BUILDING, FLARE AND BIOGAS PURIFICATION & BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE, ALL OTHER ASSOCIATED SITE WORKS AND THE PROVISION OF 8 PASSING BAYS ON THE PUBLIC ROAD BETWEEN THE SITE AND THE R252 ROAD AND THE PROVISION OF AN IMPROVED SIGHT LINE AT THE JUNCTION OF THE L7033 ROAD AND THE R252 ROAD |
1351569 |
APPLICATION FINALISED |
PERMISSION |
C |
11/12/2013 Wednesday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
DEVELOPMENT OF A COMMERCIAL CENTRALISED ANEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, A CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING:TWO FEED HOPPERS, PRE PIT,CHP BUILDING, GAS COMPRESSION & CO2 BUILDING, FLARE AND BIOGAS PURIFICATION & BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE, ALL OTHER ASSOCIATED SITE WORKS; IMPROVED SIGHT LINES AT THE ENTRANCE TO THE SITE FROM THE R253 ROAD INVOLVING ALTERATION OF THE LEVELS OF THE R253 ROAD; TWO PASSING BAYS ON THE R253 ROAD BETWEEN ITS JUNCTION WITH THE R252 ROAD AND THE ENTRANCE TO THE SITE; AND THE WIDENING OF THE LANEWAY |
1451147 |
INCOMPLETED APPLICATION |
PERMISSION |
|
29/09/2014 Monday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
CONSTRUCTION OF (1) A FEEDSTOCK/RECEPTION BUILDING TO HOUSE FEED HOPPER, STORAGE AREA AND ASSOCIATED TANKS IN LIEU OF FEED HOPPERS APPROVED ON SITE UNDER PLANNING REF: 13/51569 (2) GAS PURIFICATION, BOTTLING PLANT AND C02 BUILDING WHICH INCLUDES 2 NO STORAGE TANKS AND 1 NO COOLING TOWER TO THE NORTHERN SIDE OF THE SITE IN LIEU OF THAT APPROVED UNDER PLANNING PERMISSION 13/51569 (3) CHP BUILDING TO THE EASTERN SIDE OF THE SITE, FLARE TO THE SOUTH WESTERN SIDE AND PRE PIT TO THE SOUTH EASTERN SIDE OF THE SITE ALL IN LIEU OF THAT APPROVED UNDER PLANNING REF: 13/51569 (4) A WEIGHBRIDGE (5) BOUNDARY RETAINING WALL AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS AND RETENTION AND COMPLETION OF A CONCRETE COVERED ACCESS ROAD AND LORRY WASH DOWN AREA TO SERVICE THE PROPOSED DEVELOPMENT |
1451359 |
INCOMPLETED APPLICATION |
PERMISSION |
|
21/11/2014 Friday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
AMENDMENTS TO A PREVIOUSLY APPROVED DEVELOPMENT UNDER DONEGAL COUNTY COUNCIL PLANNING REFERENCE 13/51569. THE APPROVED DEVELOPMENT IS A COMMERCIAL CENTRALISED ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOVLING THE CONSTRUCTION /PROVISION OF: FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES AND A CO-JOINING PUMP ROOM; TWO FEED HOPPERS; PRE PIT; COMBINED HEAT AND POWER (CHP) BUILDING; GAS COMPRESSION & C02 BUILDING; FLARE; BIOGAS PURIFICATION & BOTTLING UNIT; EARTH BUND; CONCRETE APRON; ALL DRAINAGE; ALL OTHER ASSOCIATED SITE WORKS, IMPROVED SIGHT LINES AT THE ENTRANCE TO THE SITE FROM THE R253 ROAD INVOLVING ALTERATIONS OF THE LEVELS OF THE R253 ROAD,TWO PASSING BAYS ON THE R253 ROAD BETWEEN ITS JUNCTION WITH THE R252 ROAD AND THE ENTRANCE TO THE SITE; AND THE WIDENING OF THE LANEWAY TO THE SITE. THE AMENDMENTS SOUGHT COMPRISE : (A) INCREASE OF SITE AREA; (B) REORGANISATION OF THE SITE LAYOUT WITHIN THE ENLARGED SITE AREA TO INCLUDE THE FOLLOWING;(I) REPLACING THE CO-JOINING PUMP ROOM WITH A PUMP HOUSE BUILDING; (II) THE PROVISION OF A CONTROL BUILDING. (III) C02 COMPRESSION BUILDING , COOLING TOWER, GAS STORAGE TANKS AND TRUCK FILLING POINT (IV) WEIGHBRIDGE, LORRY WASHDOWN AREA, WATER PUMPING STATION, STORM WATER INCEPTOR,WASTE WATER STORAGE TANK, RETAINING WALL, BUND WALL AND ASSOCIATED LANDSCAPING (V) PROVISION OF A PRE PIT AND FLARE IN LIEU OF THAT APPROVED (VI) PROVISION OF A CONTAINERISED CHP ENGINE AND AN ASSOCIATED STACK IN LIEU OF APPROVED CHP BUILDING AND (VIII) A FEEDSTOCK RECEPTION BUILDING CONTAINING FEED STOCK AREAS, LIQUID FEED TANKS, PASTEURISATION TANKS AND FEED HOPPERS IN LIEU OF THE APPROVED FEED HOPPERS; AND (C) PERMISSION TO PROCESS ALTERNATIVE FEED STOCKS. RETENTION PLANNING PERMISSION IS SOUGHT FOR RETENTION AND COMPLETION OF TWO ACCESS ROADS TO SERVICE THE SITE LINKING IT TO THE EXISTING ROADS WITHIN THE GLENMORE ESTATE. THE PLANNING APPLICATION WILL BE ACCOMPANIED BY AN ENVIRONMENTAL IMPACT STATEMENT (EIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE UNDER THE ENVIRONMENTAL PROTECTION AGENCY (INDUSTRIAL EMISSIONS) (LICENSING) REGULATIONS 2013 |
1451399 |
APPLICATION FINALISED |
PERMISSION |
C |
02/12/2014 Tuesday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
(1) A COMMERCIAL CENTRALISED ANAEROBIC DIGESTER WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCK'S AND PRODUCE RENEWABLE ENERGY AND FERTILISER. THE WORKS SHALL INVOLVE THE CONSTRUCTION/ PROVISION OF THE FOLLOWING: (A) FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, (B) PUMP HOUSE BUILDING, (C) CONTROL BUILDING, (D) C02 COMPRESSION BUILDING, COOLING TOWER,GAS STORAGE TANKS AND TRUCK FILING POINT, (E) PROVISION OF A CONTAINERISED CHP ENGINE AND AN ASSOCIATED STACK, (F) BIOGAS PURIFICATION AND BOTTLING PLANT UNIT, (G) A FEEDSTOCK RECEPTION BUILDING CONTAINING FEEDSTOCKS AREAS, LIQUID FEED TANKS, PASTEURISATION TANKS, (H) WEIGHBRIDGE, LORRY WASH-DOWN AREA, WATER PUMPING STATION, STORM WATER INTERCEPTOR , WASTE WATER STORAGE TANK, SUD'S STORM WATER ATTENUATION, RETAINING WALL, BUND WALL AND ASSOCIATED LANDSCAPING (I) PROVISION OF A PRE PIT, FLARE, CARBON FILTER AND STACK (J) ALL DRAINAGE AND OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND (2) RETENTION AND COMPLETION OF TWO ACCESS ROADS TO SERVICE THE SITE LINKING IT TO EXISTING ROADS WITHIN THE GLENMORE ESTATE |