Planning Application: 1260039 (Donegal County Council )
File Number:
1260039
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
28/02/2012
Decision Due Date:
24/05/2012
Validated Date:
28/02/2012
Invalidated Date:
Further Info Requested:
20/04/2012
Further Info Received:
27/04/2012
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
24/05/2012
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
KAROL MCELHINNEY
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
CONSTRUCTION OF THE FOLLOWING (1) 4 NO. AGRICULTURAL SLATTED SHEDS (2) 1 NO DRY SHED FOR STORAGE OF GRAIN AND MACHINERY (3) 1 NO. CONCRETE SILAGE PIT (4) 1 nO. ROOFED DUNGSTEAD (5) ASSOCIATED SITE DEVELOPMENT WORKS DRAINAGE AND CONCRETE APRONS
CONSTRUCTION OF THE FOLLOWING (1) 4 NO. AGRICULTURAL SLATTED SHEDS (2) 1 NO DRY SHED FOR STORAGE OF GRAIN AND MACHINERY (3) 1 NO. CONCRETE SILAGE PIT (4) 1 nO. ROOFED DUNGSTEAD (5) ASSOCIATED SITE DEVELOPMENT WORKS DRAINAGE AND CONCRETE APRONS
CONSTRUCTION OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL PROVIDE FOR THE ERECTION OF A RECEPTION SHED WITH MIXING AND RECEPTION TANKS AND PLANT ROOM, A BUFFER TANK, CHP ELECTRICAL ROOMS, A DIGESTER AND SECONDARY DIGESTER TANK WITH A CO-JOINING PUMPROOM AND A STORAGE TANK
DEVELOPMENT OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL INCLUDE THE CONSTRUCTION OF A BIOLENE COVERED PRIMARY AND SECONDARY DIGESTER WITH A CO-JOINING PUMP ROOM, SEPARATE BIOLENE COVERED PRIMARY DIGESTER AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING FEED HOPPER, PRE PIT, CHP BUILDING, ELECTRICAL SUB STATION, FLARE. WORKS SHALL INCLUDE THE PROVISION OF A STONE FILLED GABION WALL EARTHERN BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
AMENDMENTS TO PLANNING PERMISSION REF: 12/60039 (1) REDUCE FINISHED FLOOR LEVELS OF THE FOLLOWING APPROVED STRUCTURES (A) SLATTED SHED NO.1 FROM 137.50M TO 135.00M (B) SILAGE PIT FROM 139.00M TO 135.00M AND (C) MACHINERY AND GRAIN SHED FROM 139.00 TO 135.00M (2) INCREASE EAVES LEVEL OF APPROVED MACHINERY AND GRAIN SHED FROM 6.0 METRES TO 9.0 METRES TO FACILITATE STORAGE OF MACHINERY AND DELIVERY OF GRAIN (3) PROVISION OF A PITCHED ROOF OVER THE APPROVED SILAGE PIT. CONSTRUCTION OF (1) A CATTLE HANDLING FACILITY TO THE SIDE OF EXISTING CATTLE SHED AND (2) ROOFED PENS BETWEEN EXISTING CATTLE SHED AND PROPOSED SLATTED SHED NO. 4 AND (3) ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS
No Environment Impact Assesments Associated with this Application