Please note: This application is outside the statutory period for acceptance of submissions
Planning Application: 1451359 (Donegal County Council )
File Number:
1451359
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
21/11/2014
Decision Due Date:
Validated Date:
Invalidated Date:
21/11/2014
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
03/01/2015
Applicant Details
Applicant name:
GLENMORE BOIGAS LTD
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
AMENDMENTS TO A PREVIOUSLY APPROVED DEVELOPMENT UNDER DONEGAL COUNTY COUNCIL PLANNING REFERENCE 13/51569. THE APPROVED DEVELOPMENT IS A COMMERCIAL CENTRALISED ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOVLING THE CONSTRUCTION /PROVISION OF: FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES AND A CO-JOINING PUMP ROOM; TWO FEED HOPPERS; PRE PIT; COMBINED HEAT AND POWER (CHP) BUILDING; GAS COMPRESSION & C02 BUILDING; FLARE; BIOGAS PURIFICATION & BOTTLING UNIT; EARTH BUND; CONCRETE APRON; ALL DRAINAGE; ALL OTHER ASSOCIATED SITE WORKS, IMPROVED SIGHT LINES AT THE ENTRANCE TO THE SITE FROM THE R253 ROAD INVOLVING ALTERATIONS OF THE LEVELS OF THE R253 ROAD,TWO PASSING BAYS ON THE R253 ROAD BETWEEN ITS JUNCTION WITH THE R252 ROAD AND THE ENTRANCE TO THE SITE; AND THE WIDENING OF THE LANEWAY TO THE SITE. THE AMENDMENTS SOUGHT COMPRISE : (A) INCREASE OF SITE AREA; (B) REORGANISATION OF THE SITE LAYOUT WITHIN THE ENLARGED SITE AREA TO INCLUDE THE FOLLOWING;(I) REPLACING THE CO-JOINING PUMP ROOM WITH A PUMP HOUSE BUILDING; (II) THE PROVISION OF A CONTROL BUILDING. (III) C02 COMPRESSION BUILDING , COOLING TOWER, GAS STORAGE TANKS AND TRUCK FILLING POINT (IV) WEIGHBRIDGE, LORRY WASHDOWN AREA, WATER PUMPING STATION, STORM WATER INCEPTOR,WASTE WATER STORAGE TANK, RETAINING WALL, BUND WALL AND ASSOCIATED LANDSCAPING (V) PROVISION OF A PRE PIT AND FLARE IN LIEU OF THAT APPROVED (VI) PROVISION OF A CONTAINERISED CHP ENGINE AND AN ASSOCIATED STACK IN LIEU OF APPROVED CHP BUILDING AND (VIII) A FEEDSTOCK RECEPTION BUILDING CONTAINING FEED STOCK AREAS, LIQUID FEED TANKS, PASTEURISATION TANKS AND FEED HOPPERS IN LIEU OF THE APPROVED FEED HOPPERS; AND (C) PERMISSION TO PROCESS ALTERNATIVE FEED STOCKS. RETENTION PLANNING PERMISSION IS SOUGHT FOR RETENTION AND COMPLETION OF TWO ACCESS ROADS TO SERVICE THE SITE LINKING IT TO THE EXISTING ROADS WITHIN THE GLENMORE ESTATE. THE PLANNING APPLICATION WILL BE ACCOMPANIED BY AN ENVIRONMENTAL IMPACT STATEMENT (EIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE UNDER THE ENVIRONMENTAL PROTECTION AGENCY (INDUSTRIAL EMISSIONS) (LICENSING) REGULATIONS 2013
DEVELOPMENT OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL INCLUDE THE CONSTRUCTION OF A BIOLENE COVERED PRIMARY AND SECONDARY DIGESTER WITH A CO-JOINING PUMP ROOM, SEPARATE BIOLENE COVERED PRIMARY DIGESTER AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING FEED HOPPER, PRE PIT, CHP BUILDING, ELECTRICAL SUB STATION, FLARE. WORKS SHALL INCLUDE THE PROVISION OF A STONE FILLED GABION WALL EARTHERN BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT OF A COMMERCIAL CENTRALISED ANEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, A CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING:TWO FEED HOPPERS, PRE PIT,CHP BUILDING, GAS COMPRESSION & CO2 BUILDING, FLARE AND BIOGAS PURIFICATION & BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE, ALL OTHER ASSOCIATED SITE WORKS; IMPROVED SIGHT LINES AT THE ENTRANCE TO THE SITE FROM THE R253 ROAD INVOLVING ALTERATION OF THE LEVELS OF THE R253 ROAD; TWO PASSING BAYS ON THE R253 ROAD BETWEEN ITS JUNCTION WITH THE R252 ROAD AND THE ENTRANCE TO THE SITE; AND THE WIDENING OF THE LANEWAY