Planning Application: 1350869 (Donegal County Council )
File Number:
1350869
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
01/07/2013
Decision Due Date:
25/08/2013
Validated Date:
01/07/2013
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
22/08/2013
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
04/08/2013
Applicant Details
Applicant name:
GLENMORE ESTATE AGHAVEAGH NW LTD
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF A PRIMARY AND SECONDARY DIGESTER WITH COLLECTION DOME, A CO - JOINING PUMP ROOM, SEPARATE DIGESTATE STORAGE TANK WITH COLLECTION DOME, SEPARATE SLURRY STORAGE TANK WITH COLLECTION DOME AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING: TWO FEED HOPPERS, PRE PIT, CHP BUILDING, ELECTRICAL SUBSTATION, FLARE AND BIOGAS BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE WORKS
AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF A PRIMARY AND SECONDARY DIGESTER WITH COLLECTION DOME, A CO - JOINING PUMP ROOM, SEPARATE DIGESTATE STORAGE TANK WITH COLLECTION DOME, SEPARATE SLURRY STORAGE TANK WITH COLLECTION DOME AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING: TWO FEED HOPPERS, PRE PIT, CHP BUILDING, ELECTRICAL SUBSTATION, FLARE AND BIOGAS BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE WORKS
CONSTRUCTION OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL PROVIDE FOR THE ERECTION OF A RECEPTION SHED WITH MIXING AND RECEPTION TANKS AND PLANT ROOM, A BUFFER TANK, CHP ELECTRICAL ROOMS, A DIGESTER AND SECONDARY DIGESTER TANK WITH A CO-JOINING PUMPROOM AND A STORAGE TANK
DEVELOPMENT OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL INCLUDE THE CONSTRUCTION OF A BIOLENE COVERED PRIMARY AND SECONDARY DIGESTER WITH A CO-JOINING PUMP ROOM, SEPARATE BIOLENE COVERED PRIMARY DIGESTER AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING FEED HOPPER, PRE PIT, CHP BUILDING, ELECTRICAL SUB STATION, FLARE. WORKS SHALL INCLUDE THE PROVISION OF A STONE FILLED GABION WALL EARTHERN BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
COMMERCIAL CENTRALISED ANEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF ANEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING:TWO FEED HOPPERS, PRE PIT,CHP BUILDING, GAS COMPRESSION & CO2 BUILDING, FLARE AND BIOGAS PURIFICATION & BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE, ALL OTHER ASSOCIATED SITE WORKS AND THE PROVISION OF 8 PASSING BAYS ON THE PUBLIC ROAD BETWEEN THE SITE AND THE R252 ROAD AND THE PROVISION OF AN IMPROVED SIGHT LINE AT THE JUNCTION OF THE L7033 ROAD AND THE R252 ROAD
DEVELOPMENT OF A COMMERCIAL CENTRALISED ANEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, A CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING:TWO FEED HOPPERS, PRE PIT,CHP BUILDING, GAS COMPRESSION & CO2 BUILDING, FLARE AND BIOGAS PURIFICATION & BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE, ALL OTHER ASSOCIATED SITE WORKS; IMPROVED SIGHT LINES AT THE ENTRANCE TO THE SITE FROM THE R253 ROAD INVOLVING ALTERATION OF THE LEVELS OF THE R253 ROAD; TWO PASSING BAYS ON THE R253 ROAD BETWEEN ITS JUNCTION WITH THE R252 ROAD AND THE ENTRANCE TO THE SITE; AND THE WIDENING OF THE LANEWAY
No Environment Impact Assesments Associated with this Application