Please note: This application is outside the statutory period for acceptance of submissions
Planning Application: 1451147 (Donegal County Council )
File Number:
1451147
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
29/09/2014
Decision Due Date:
Validated Date:
Invalidated Date:
29/10/2014
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
02/11/2014
Applicant Details
Applicant name:
GLENMORE ESTATE BOGAS LIMITED
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
CONSTRUCTION OF (1) A FEEDSTOCK/RECEPTION BUILDING TO HOUSE FEED HOPPER, STORAGE AREA AND ASSOCIATED TANKS IN LIEU OF FEED HOPPERS APPROVED ON SITE UNDER PLANNING REF: 13/51569 (2) GAS PURIFICATION, BOTTLING PLANT AND C02 BUILDING WHICH INCLUDES 2 NO STORAGE TANKS AND 1 NO COOLING TOWER TO THE NORTHERN SIDE OF THE SITE IN LIEU OF THAT APPROVED UNDER PLANNING PERMISSION 13/51569 (3) CHP BUILDING TO THE EASTERN SIDE OF THE SITE, FLARE TO THE SOUTH WESTERN SIDE AND PRE PIT TO THE SOUTH EASTERN SIDE OF THE SITE ALL IN LIEU OF THAT APPROVED UNDER PLANNING REF: 13/51569 (4) A WEIGHBRIDGE (5) BOUNDARY RETAINING WALL AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS AND RETENTION AND COMPLETION OF A CONCRETE COVERED ACCESS ROAD AND LORRY WASH DOWN AREA TO SERVICE THE PROPOSED DEVELOPMENT
DEVELOPMENT OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL INCLUDE THE CONSTRUCTION OF A BIOLENE COVERED PRIMARY AND SECONDARY DIGESTER WITH A CO-JOINING PUMP ROOM, SEPARATE BIOLENE COVERED PRIMARY DIGESTER AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING FEED HOPPER, PRE PIT, CHP BUILDING, ELECTRICAL SUB STATION, FLARE. WORKS SHALL INCLUDE THE PROVISION OF A STONE FILLED GABION WALL EARTHERN BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
DEVELOPMENT OF A COMMERCIAL CENTRALISED ANEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, A CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING:TWO FEED HOPPERS, PRE PIT,CHP BUILDING, GAS COMPRESSION & CO2 BUILDING, FLARE AND BIOGAS PURIFICATION & BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE, ALL OTHER ASSOCIATED SITE WORKS; IMPROVED SIGHT LINES AT THE ENTRANCE TO THE SITE FROM THE R253 ROAD INVOLVING ALTERATION OF THE LEVELS OF THE R253 ROAD; TWO PASSING BAYS ON THE R253 ROAD BETWEEN ITS JUNCTION WITH THE R252 ROAD AND THE ENTRANCE TO THE SITE; AND THE WIDENING OF THE LANEWAY
(1) A COMMERCIAL CENTRALISED ANAEROBIC DIGESTER WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCK'S AND PRODUCE RENEWABLE ENERGY AND FERTILISER. THE WORKS SHALL INVOLVE THE CONSTRUCTION/ PROVISION OF THE FOLLOWING: (A) FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, (B) PUMP HOUSE BUILDING, (C) CONTROL BUILDING, (D) C02 COMPRESSION BUILDING, COOLING TOWER,GAS STORAGE TANKS AND TRUCK FILING POINT, (E) PROVISION OF A CONTAINERISED CHP ENGINE AND AN ASSOCIATED STACK, (F) BIOGAS PURIFICATION AND BOTTLING PLANT UNIT, (G) A FEEDSTOCK RECEPTION BUILDING CONTAINING FEEDSTOCKS AREAS, LIQUID FEED TANKS, PASTEURISATION TANKS, (H) WEIGHBRIDGE, LORRY WASH-DOWN AREA, WATER PUMPING STATION, STORM WATER INTERCEPTOR , WASTE WATER STORAGE TANK, SUD'S STORM WATER ATTENUATION, RETAINING WALL, BUND WALL AND ASSOCIATED LANDSCAPING (I) PROVISION OF A PRE PIT, FLARE, CARBON FILTER AND STACK (J) ALL DRAINAGE AND OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND (2) RETENTION AND COMPLETION OF TWO ACCESS ROADS TO SERVICE THE SITE LINKING IT TO EXISTING ROADS WITHIN THE GLENMORE ESTATE
No Environment Impact Assesments Associated with this Application