File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
15600578 |
INCOMPLETED APPLICATION |
PERMISSION |
|
10/07/2015 Friday |
DunoAir Windpark Curraheen Limited |
Curraghadobbin, Macreary, Ballinurra, Poulmaleen, Newtown Upper, Lissadober, Ballynacloona, Mayladstown, Kylanoreashy, Butlerstown and Ballydine Co. Tipperary |
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 5.3 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 12.8 km) running in the public road from the wind farm site to the ESB Sub-Station at Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from an upgraded existing entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); from a new access to Carrigadoon Hill from the county road to the west of Carrigadoon Hill (Bullinurra) and a new access to Curraghdobbin Hill from the county road to the east of Curraghadobbin Hill(Ballinurra). An Environmental Impact Statement has been prepared and is submitted with the application |
16600552 |
APPLICATION FINALISED |
PERMISSION |
R |
14/06/2016 Tuesday |
DunoAir Windpark Curraheen Limited |
Curraghadobbin, Macreary, Ballinurra, Poulmaleen, Newtown Upper, Lissadober, Ballynacloona, Mayladstown, Kylanoreashy, Butlerstown and Ballydine Co. Tipperary |
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 6 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 13.9 km) running in the public road from the wind farm site to Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from a relocated and upgraded entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); and from a new access to Curraghdobbin Hill from the county road to the south of Curraghadobbin Hill (Curraghadobbin) An Environmental Impact Statement has been prepared and is submitted with the application |
17601233 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
09/11/2017 Thursday |
Anthony Ryan |
Butlerstown Kilsheelan Clonmel |
to retain indefinitely the as constructed single storey extension to the rear of my dwelling and the one and a half storey extensions to both sides of my dwelling and 2 no. timber sheds and all associated site development works |
18600012 |
APPLICATION FINALISED |
PERMISSION |
C |
05/01/2018 Friday |
Vera Butler and David Power |
Butlerstown Kilsheelan Co. Tipperary |
removal of the existing extensions at either side of our dwelling, to construct new extensions to the front, rear and sides of our dwelling, to alter the internal layout of our dwelling, to construct a garage and all ancillary site works |
211763 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
R |
07/12/2021 Tuesday |
Mandy Keever |
Keever's Pub Newtown Lower Faugheen, Carrick-on-Suir |
works carried out at our property comprising of the construction of a covered outdoor dining space, extension to rear of property for storage and staff circulation associated with the kitchen space, storage unit to rear of property, vehicular entrance opening to the South road facing boundary wall and hardcore surface area on site for the purpose of on-site parking and all associated site works |