Planning Application: 15600578 (Tipperary County Council )
File Number:
15600578
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
10/07/2015
Decision Due Date:
Validated Date:
Invalidated Date:
10/07/2015
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
13/08/2015
Applicant Details
Applicant name:
DunoAir Windpark Curraheen Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 5.3 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 12.8 km) running in the public road from the wind farm site to the ESB Sub-Station at Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from an upgraded existing entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); from a new access to Carrigadoon Hill from the county road to the west of Carrigadoon Hill (Bullinurra) and a new access to Curraghdobbin Hill from the county road to the east of Curraghadobbin Hill(Ballinurra). An Environmental Impact Statement has been prepared and is submitted with the application
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 6 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 13.9 km) running in the public road from the wind farm site to Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from a revised and upgraded existing entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); and from a new access to Curraghdobbin Hill from the county road to the south of Curraghadobbin Hill (Curraghadobbin) An Environmental Impact Statement has been prepared and is submitted with the application