Planning Application: 16600552 (Tipperary County Council )
File Number:
16600552
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
14/06/2016
Decision Due Date:
08/08/2016
Validated Date:
14/06/2016
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
08/08/2016
Leave to Appeal:
Appeal Date:
05/09/2016
Commenced Date:
Submissions By:
18/07/2016
Applicant Details
Applicant name:
DunoAir Windpark Curraheen Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 6 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 13.9 km) running in the public road from the wind farm site to Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from a relocated and upgraded entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); and from a new access to Curraghdobbin Hill from the county road to the south of Curraghadobbin Hill (Curraghadobbin) An Environmental Impact Statement has been prepared and is submitted with the application
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 6 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 13.9 km) running in the public road from the wind farm site to Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from a relocated and upgraded entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); and from a new access to Curraghdobbin Hill from the county road to the south of Curraghadobbin Hill (Curraghadobbin) An Environmental Impact Statement has been prepared and is submitted with the application
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 6 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 13.9 km) running in the public road from the wind farm site to Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from a revised and upgraded existing entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); and from a new access to Curraghdobbin Hill from the county road to the south of Curraghadobbin Hill (Curraghadobbin) An Environmental Impact Statement has been prepared and is submitted with the application