Planning Application: 18600012 (Tipperary County Council )
File Number:
18600012
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
05/01/2018
Decision Due Date:
01/03/2018
Validated Date:
05/01/2018
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
23/02/2018
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
08/02/2018
Applicant Details
Applicant name:
Vera Butler and David Power
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
removal of the existing extensions at either side of our dwelling, to construct new extensions to the front, rear and sides of our dwelling, to alter the internal layout of our dwelling, to construct a garage and all ancillary site works
Development Address:
Butlerstown, Kilsheelan, Co. Tipperary
Architect Name:
Location Key:
BUTLERSTOWN, KILSHEELAN
Electoral Division:
Planner:
Jonathan Flood
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
23/02/2018
Manager Order:
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
30/03/2018
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
29/03/2023
Decision Description:
removal of the existing extensions at either side of our dwelling, to construct new extensions to the front, rear and sides of our dwelling, to alter the internal layout of our dwelling, to construct a garage and all ancillary site works
development at this site, the development will consist of the construction of a windfarm which comprises 8 no. turbines (max blade tip height not exceeding 126.5m), construction of approx. 6 km of new access roads within the windfarm site, an electrical sub-station (62.9 sq.m.), meteorological mast (80m), 38 kV underground grid connection (approx 13.9 km) running in the public road from the wind farm site to Ballydine, associated drainage and site development works. The proposed wind farm is located on Curraghadobbin Hill (3 no. turbines) and Carrigadoon Hill (5 No. turbines). Vehicular access/egress to/from the site is from a revised and upgraded existing entrance on the county road to the east of Carrigadoon Hill (at Newtown Upper); and from a new access to Curraghdobbin Hill from the county road to the south of Curraghadobbin Hill (Curraghadobbin) An Environmental Impact Statement has been prepared and is submitted with the application