File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
0070035 |
APPLICATION FINALISED |
PERMISSION |
C |
10/03/2000 Friday |
Institute of Technology |
Ballytivnan Sligo
|
Extension and change of use to educational use - Unit 14, St Columbas Hospital |
0170006 |
APPLICATION FINALISED |
PERMISSION |
C |
29/01/2001 Monday |
Institute of Technology |
Institute of Technology Ballinode Sligo |
to construct general engineering workshop single storey extension to engineering block |
0170056 |
FURTHER INFORMATION |
PERMISSION |
C |
16/05/2001 Wednesday |
John Beirne |
25 Pearse Road Sligo
|
construct a granny flat, front porch, Kitchen Extension and rear bedroom extension |
0170059 |
APPLICATION FINALISED |
PERMISSION |
C |
18/05/2001 Friday |
Institute of Technology |
Institute of Technology Ballinode Sligo |
to construct three storey apprentice building with carparking, siteworks and services |
0270043 |
APPLICATION FINALISED |
TEMPORARY PERMISSION |
C |
26/07/2002 Friday |
Institute Of Technology |
Ballinode Sligo
|
(a) Retain temporary access off Ash Lane to facilitate athletics track constuction, (b) Works associated with provision of athletics track comprising the retention of works (c ). Outline permission for all weather pitch, (d), Retention of 8 no. floodlight masts, (e), landfill operations, all at Sligo Institute of Technology |
0270044 |
APPLICATION FINALISED |
PERMISSION |
C |
02/07/2002 Tuesday |
Institute of Technology |
Ballinode Sligo
|
to carryout facade enhancement works to western & northern elevations of the original 1970 building comprising window replacement & metal panel over cladding at Institute of Technology. |
0470143 |
APPLICATION FINALISED |
PERMISSION |
C |
08/12/2004 Wednesday |
Institute of Technology |
Institute of Technology Ballinode Sligo |
to construct a 210sq.m two-storey extension in the courtyard area of Block B |
0670001 |
APPLICATION FINALISED |
PERMISSION |
C |
09/01/2006 Monday |
IDA Ireland |
IDA Business & Tech. Park Finisklin Sligo |
revisions to previously approved development PD 64/00, consisting of a 1797sq.m. advance light industrial unit with offices, car parking and associated site development works |
0848 |
APPLICATION FINALISED |
PERMISSION |
C |
29/01/2008 Tuesday |
Rehab Group |
Aghamore Far Sligo Co. Sligo |
construction of a 37 sq.m extension to a building and for permission for retention for the change of use of the existing building from use as an office to use as a day care centre
|
0870 |
APPLICATION FINALISED |
RETENTION |
R |
05/02/2008 Tuesday |
Kevinsfort Limited |
Toberbride Business Park Toberbride Collooney |
retention of site signage(3.6m wide by 3m high approx)
|
0884 |
APPLICATION FINALISED |
PERMISSION |
C |
05/02/2008 Tuesday |
Paul & Denise Cadden |
Cartronabree Knocknahur Co. Sligo |
construction of 63msq single storey extension to the rear and west side of existing dwelling, including all associated services and site works
|
08109 |
APPLICATION FINALISED |
PERMISSION |
C |
15/02/2008 Friday |
Patrick & Angela Reilly |
Drumnasoohy Drumnacool Co. Sligo |
construction of extensions to existing dwelling house consisting of a living room extension on south east gable together with bedrooms on north west elevation
|
0964 |
APPLICATION FINALISED |
PERMISSION |
C |
12/02/2009 Thursday |
Gabriel & Mary Armstrong |
Buneos Aryes Rise (Carrowbunnaun Td) Strandhill Village Co Sligo |
extension to bedroom over existing garage to form a two-storey structure to the same ridge line as existing dwelling, construct a stone façade on front elevation, construct new roof over existing flat roof porch, new slated roof on dwelling and all associated services
|
1470001 |
INCOMPLETED APPLICATION |
PERMISSION |
|
20/01/2014 Monday |
Cex Ltd |
O'Connell Street Sligo |
construction of a new shop entrance to Unit 1 onto O'Connell Street, Sligo and replace shop entrance with display window onto shopping mall, widen existing shop entrance to Unit 2, paint shop fronts in the Cex Corporate colours Red Ral 3000 and remove partition wall between Units 1 & 2, Sligo Shopping Centre
|
16192 |
APPLICATION FINALISED |
PERMISSION |
C |
11/05/2016 Wednesday |
Institute of Technology Sligo |
Institute of Technology Sligo Clarion Road Ballinode |
internal and external refurbishment works to the School of Business and Social Studies consisting of (1) demolition of existing single storey classroom extension and single storey plant room to the north of Block D (2) raising the existing parapet height and recladding all elevations to Block D (3) construction of a new entrance canopy on the north facade of Block D (4) raising existing staircase to allow access to roof level of Block D (5) overcladding of existing rooftop plant rooms to Block D (6) enlarging existing gas compound to the west of Block D (7) construction of new external ramp outside Block C entrance and increasing the area of paved landscaping outside Block D, together with associated site development works, services and signage
|
974090 |
|
|
|
|
|
|
|
994602 |
|
|
|
|
|
|
|
994688 |
|
|
|
|
|
|
|