File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
07272 |
APPLICATION FINALISED |
RETENTION |
C |
22/03/2007 Thursday |
Peter Paul Burns |
Aughamore Far Co. Sligo
|
retention for the following deviations from the original planning permission (PL99/280) granted for site: (A)alterations to elevations from those granted (B)structure was constructed approximately 25m to the north of its location on the previously granted application(C)site services and access road had to be realigned to accomodate the new location of the building
|
071152 |
WITHDRAWN |
PERMISSION |
|
09/11/2007 Friday |
Rehab Group |
Aghamore Far Sligo Co. Sligo |
construction of a 37 sq.m extension to a building and for temporary permission for change of use of the existing building from use as an office to use as a day centre
|
08482 |
WITHDRAWN |
PERMISSION |
|
24/06/2008 Tuesday |
Peter Paul Burns |
Aughamore Far Td Co Sligo
|
construction of a research and development centre, with training in the design and installation of sustainable and renewable energies in a new landscape campus. The development will comprise of a research and development centre (single story of 1,085sq.m) with 3 No. buildings based on dwelling house design, unit 1-dormer type 165m2, unit 2-two storey traditional type 143m2 and unit 3-kingspan lighthouse type 120m2, all constructed to the new code for sustainable homes (Ire & Uk). with associated construction of site access roadway, footpaths, 80 car parking spaces, underground electrical and telecom services, fencing, and on-site foul water treatment system by Bison (concrete range 150 P.E. + Uv Treatment) sewage treatment system with raised polishing filter and percolation area. The development will also include Eco Friendly storm water harvesting which will be utilised throughout to reduce water supply demand, and in keeping with Eco Friendly Systems Wood-Pellet Burner enclosure and storage
|
0970 |
WITHDRAWN |
PERMISSION |
R |
16/02/2009 Monday |
Peter Paul Burns |
Aughamore Far Co. Sligo |
construction of a research and development centre with training in the design and installation of sustainable and renewable energies in a new landscaped campus. The development will comprise of a research and development training centre (single storey of 1,085sqm) with 3 no demonstration/tutorial buildings based on dwelling house design (Unit 1 - dormer type 165sm, Unit 2 - two storey traditional type 143sqm and Unit 3 - Kingspan lighthouse type 120sqm) all constructed to the new code for sustainable homes (Ire & UK) with associated construction of site access roadway, footpaths, 80 car parking spaces, underground electrical and telecom services, fencing and on-site foul water treatment system by Bison (MBR 125 treatment plant) sewage treatment system with raised polishing filter and percolation area. The development will also include eco-friendly storm water harvesting which will be utilised throughout to reduce water supply demand and in keeping with eco- friendly systems wood-pellet burner enclosure and storage.
|
1657 |
APPLICATION FINALISED |
PERMISSION |
C |
18/02/2016 Thursday |
Colette Kelleher on behalf of Alzheimers Society of Ireland |
Aghamore Far Sligo |
change of use of existing office block building (487 sqm) to Day Care Centre and carrying out of internal alterations associated with the change of use, construction of new canopy to the vehicular drop-off area at the main entrance located on the south-east/north-east elevations, construction of new pedestrian access door to the south-west elevation, upgrading of existing septic tank to a proprietary effluent treatment system and associated percolation area, together with all associated site works
|
17295 |
APPLICATION FINALISED |
PERMISSION |
C |
01/08/2017 Tuesday |
Institute of Technology Sligo |
Ash Lane Ballinode Sligo |
for development consisting of the erection of 2 no. enclosed bus shelters and the enlargement and realignment of existing laybys, together with associated site development works including new street lighting, retaining walls and earthen fill
|
99280 |
APPLICATION FINALISED |
PERMISSION |
C |
16/04/1999 Friday |
Maye Concrete Ltd., |
Aghamore Far, Co. Sligo.
|
construction of Readymix Regional Head Office Building with upgrading to existing access road, car parking, proprietary effluent treatment system and all associated landscaping to site |
99913 |
APPLICATION FINALISED |
PERMISSION |
C |
09/11/1999 Tuesday |
Maye Concrete Ltd., |
Aghamore Far, Co. Sligo.
|
modifications to previous planning permission PL 99/280 with respect to Readymix Head Office Building at site (alterations comprise: reduced floor area and revised elevational treatment) |