revisions to previously approved development PD 64/00, consisting of a 1797sq.m. advance light industrial unit with offices, car parking and associated site development works
Development Address:
IDA Business & Tech. Park, Finisklin, Sligo
Architect Name:
Peter O'Leary
Location Key:
FINISKLIN
Electoral Division:
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
02/03/2006
Manager Order:
68/06
Decision Type:
Conditional
Number of Conditions:
13
Grant Date:
03/04/2006
Grant Managers Order #:
68/06
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
02/04/2011
Decision Description:
revisions to previously approved development PD 64/00, consisting of a 1797sq.m. advance light industrial unit with offices, car parking and associated site development works
1. Proposed new all weather GAA pitch on the site of the existing natural grass GAA pitch with existing 8 No. 16m high floodlights to be removed and replaced with new 8 No. 20m high floodlights to an average lighting level of 500 Lux. 2. Proposed new all weather multi-purpose artificial pitch with 4 No. 16m high floodlights to an average lighting level of 200 Lux. 3. Proposed 10kW wind turbine, 12m hub height and new street lighting to existing walkway. 4 Proposed 8 No. 20m high floodlights on the perimeter of the existing Athletics Stadium to an average lighting level of 200 Lux, together with all associated drainage, fencing and civil engineering works at the site of the Institute of TechnologySligo
development which will consist of refurbishment and two storey extension (299 sqm) to the courtyard areas of the existing Technology Centre building (Block B) and recladding of the entire East Elevation of Block Bat Institute of Technology
development consisting of the construction of a new on-grade car park to accommodate 150 car spaces including site lighting, drainage and landscaping with a vehicular entrance off an existing access road within the site leading to Clarion Road, new opening formed in existing boundary wall for pedestrian access, replacing and upgrading of raised pedestrian crossing point from the new car park to the existing pedestrian entrance to the main campus on Clarion Road and the construction of an external platform lift at the existing pedestrian entrance for disabled access to the main campus building. The development is located on a site north of Clarion Road at the intersection with Barroe Road and is taking place within the curtilage of a Protected Structure at the Institute of Technology
construction of a new pedestrian and cyclist infrastructure comprising: (1) a new pedestrian access off Ash Lane; (2) interconnecting paths and road crossings within the main campus; (3) a new path from Clarion Road to Blocks K & L; (4) installation of covered cycle stands, bike lockers and cycle repair stations at various locations on campus and (5) associated site development works including signage
development consisting of (1) construction of a new boundary wall to lands fronting onto Ash Lane; (2) upgrading of existing boundary wall to lands fronting onto Ballytivnan Road; (3) form two new maintenance access points with footpath crossings to Ash Lane & Ballytivnan Road; (4) new pedestrian and cyclist infrastructure including new footpaths and the installation of covered cycle stands with external lockers and traffic calming / signage and (5) associated site development works including signage
Institute of Technology Sligo Clarion Road Ballinode
internal and external refurbishment works to the School of Business and Social Studies consisting of (1) demolition of existing single storey classroom extension and single storey plant room to the north of Block D (2) raising the existing parapet height and recladding all elevations to Block D (3) construction of a new entrance canopy on the north facade of Block D (4) raising existing staircase to allow access to roof level of Block D (5) overcladding of existing rooftop plant rooms to Block D (6) enlarging existing gas compound to the west of Block D (7) construction of new external ramp outside Block C entrance and increasing the area of paved landscaping outside Block D, together with associated site development works, services and signage
for development consisting of the erection of 2 no. enclosed bus shelters and the enlargement and realignment of existing laybys, together with associated site development works including new street lighting, retaining walls and earthen fill
No Environment Impact Assesments Associated with this Application