construction of a research and development centre, with training in the design and installation of sustainable and renewable energies in a new landscape campus. The development will comprise of a research and development centre (single story of 1,085sq.m) with 3 No. buildings based on dwelling house design, unit 1-dormer type 165m2, unit 2-two storey traditional type 143m2 and unit 3-kingspan lighthouse type 120m2, all constructed to the new code for sustainable homes (Ire & Uk). with associated construction of site access roadway, footpaths, 80 car parking spaces, underground electrical and telecom services, fencing, and on-site foul water treatment system by Bison (concrete range 150 P.E. + Uv Treatment) sewage treatment system with raised polishing filter and percolation area. The development will also include Eco Friendly storm water harvesting which will be utilised throughout to reduce water supply demand, and in keeping with Eco Friendly Systems Wood-Pellet Burner enclosure and storage
retention for the following deviations from the original planning permission (PL99/280) granted for site: (A)alterations to elevations from those granted (B)structure was constructed approximately 25m to the north of its location on the previously granted application(C)site services and access road had to be realigned to accomodate the new location of the building
construction of a 37 sq.m extension to a building and for permission for retention for the change of use of the existing building from use as an office to use as a day care centre
construction of a research and development centre with training in the design and installation of sustainable and renewable energies in a new landscaped campus. The development will comprise of a research and development training centre (single storey of 1,085sqm) with 3 no demonstration/tutorial buildings based on dwelling house design (Unit 1 - dormer type 165sm, Unit 2 - two storey traditional type 143sqm and Unit 3 - Kingspan lighthouse type 120sqm) all constructed to the new code for sustainable homes (Ire & UK) with associated construction of site access roadway, footpaths, 80 car parking spaces, underground electrical and telecom services, fencing and on-site foul water treatment system by Bison (MBR 125 treatment plant) sewage treatment system with raised polishing filter and percolation area. The development will also include eco-friendly storm water harvesting which will be utilised throughout to reduce water supply demand and in keeping with eco- friendly systems wood-pellet burner enclosure and storage.
construction of Readymix Regional Head Office Building with upgrading to existing access road, car parking, proprietary effluent treatment system and all associated landscaping to site
modifications to previous planning permission PL 99/280 with respect to Readymix Head Office Building at site (alterations comprise: reduced floor area and revised elevational treatment)
No Environment Impact Assesments Associated with this Application