will consist of 60MW open cycle gas turbine power generation plant. The development comprises of the following elements: (a) a 663sq.m gas turbine building (approx. 17m wide x 41m length x 7m high) housing a fully enclosed and roofed turbo generator annexed with a similarly enclosed maintenance bay (b) associated exhaust gas stack (approx. 20m high x 2.8m diameter) and other associated stacks and vents (not exceeding 13m in height) (c) an associated air filter (approx. 15.5m high x 6.8m wide x 7.67 length) (d) a compound adjacent to the gas turbine building containing a main and an auxiliary transformer and a firewater module (e) a 316sq.m office and ancillary services building (approx. 11m wide x 31m length x 5m high) (f) 2 no. 750 cubic metre volume fuel oil tanks with concrete bund ( approx. 7.5m high) (g) 2 no. 560 cubic metre volume raw and treated water storage tanks (approx. 7.5m high) (h) a new foul sewer pipe connecting to the duleek sewer system and a new water supply pipe (i) 6 no. car parking spaces and misc. site works including an upgraded and relocated access from the R152 and internal circulation road and hard soft landscaping. Note: all heights are above existing ground levels. The application relates to a development which comprises or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence
Development Address:
Carranstown and Caulstown, Duleek, Co Meath
Architect Name:
Mags Dalton
Location Key:
CARRANSTOWN AND CAULSTOWN
Electoral Division:
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
28/07/2010
Manager Order:
S1074/10
Decision Type:
Conditional
Number of Conditions:
27
Grant Date:
01/09/2010
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
31/08/2015
Decision Description:
will consist of 60MW open cycle gas turbine power generation plant. The development comprises of the following elements: (a) a 663sq.m gas turbine building (approx. 17m wide x 41m length x 7m high) housing a fully enclosed and roofed turbo generator annexed with a similarly enclosed maintenance bay (b) associated exhaust gas stack (approx. 20m high x 2.8m diameter) and other associated stacks and vents (not exceeding 13m in height) (c) an associated air filter (approx. 15.5m high x 6.8m wide x 7.67 length) (d) a compound adjacent to the gas turbine building containing a main and an auxiliary transformer and a firewater module (e) a 316sq.m office and ancillary services building (approx. 11m wide x 31m length x 5m high) (f) 2 no. 750 cubic metre volume fuel oil tanks with concrete bund ( approx. 7.5m high) (g) 2 no. 560 cubic metre volume raw and treated water storage tanks (approx. 7.5m high) (h) a new foul sewer pipe connecting to the duleek sewer system and a new water supply pipe (i) 6 no. car parking spaces and misc. site works including an upgraded and relocated access from the R152 and internal circulation road and hard soft landscaping. Note: all heights are above existing ground levels. The application relates to a development which comprises or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence
the proposed development will comprise a 208MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant & comprises the following elements: a) 4 No containerised Peaker Plant units (each 248m2 and c. 8m wide x 31m long x 3.5m high), each housing a fully enclosed & roofed turbo generator comprising of 2No. turbines with a common generator, all on a concrete plinth of 615m2; b) Each unit has two exhaust stacks (15m in height) one for each turbine; c) Water treatment plant comprising: 275m2 Water Treatment (Demineralisation) Building (6m high x 11m wide x 25m long); a 120m2 raw water treatment tank of 1000m3 (c. 10m high); a 315m2 deionized (treated water) water storage tank (max. volume of 4900m3) c. 16m high; hydrochloric acid tank (5m3) c. 3m high; sodium hydroxide tank (2.5m3) c.2m high; waste water storage tank (40m3) (c.2.5m high); 25m2 Firewater Module measuring 5m wide x 5m length x 5m high; Foul water pump station (slab area of 121m2) d) 2 No Fuel storage tanks to each hold a maximum volume of 4,900m3 per tank (each c. 16m high), & associated fuel pumping & filtering equipment & pipework, all within a 2350m2 concrete bund e) 3 No. Waste Storage Containers, each 80m2 (c. 3m wide x 26m length x 4m high) f) Diesel Generator with floor area of 32m2 (c. 4m wide x 8m length x 4m high) g) 2 No transformers each 160m2, & each measuring c. 8m wide x 10m length x 9m high h) a 830m2 Office & ancillary services building (c. 20 wide x 47 length x 6m high) i) a 570m2 Switchgear (MV) building (c. 13 wide x 54 length x 5m high) j) all other miscellaneous & ancillary site works, including:12 No. Car parking spaces & 3No unloading bays, widened & upgraded entrance from the R152, two lowered site platform areas & internal circulation road & hard & soft landscaping, a temorary construction compound, & palisade fencing. k) New road markings, including deceleration lane approaching the site, on the R152. The proposed development will include connection to public water & wastewater provision, supplied by Irish Water. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence & full details of the proposed development & its anticipated environmental impacts will be notified to the Environmental Protection Agency. A Natura Impact Statement (NIS) accompanies this application
a 208MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant & comprises the following elements: a) 4 No containerised Peaker Plant units (each 248m2 and c. 8m wide x 31m long x 3.5m high), each housing a fully enclosed & roofed turbo generator comprising of 2No. turbines with a common generator, all on a concrete plinth of 615m2; b) Each unit has two exhaust stacks (15m in height) one for each turbine; c) Water treatment plant comprising: 275m2 Water Treatment (Demineralisation) Building (6m high x 11m wide x 25m long); a 120m2 raw water treatment tank of 1000m3 (c. 10m high); a 315m2 deionized (treated water) water storage tank (max. volume of 4900m3) c. 16m high; hydrochloric acid tank (5m3) c. 3m high; sodium hydroxide tank (2.5m3) c.2m high; waste water storage tank (40m3) (c.2.5m high); 25m2 Firewater Module measuring 5m wide x 5m length x 5m high; Foul water pump station (slab area of 121m2) d) 2 No Fuel storage tanks to each hold a maximum volume of 4,900m3 per tank (each c. 16m high), & associated fuel pumping & filtering equipment & pipework, all within a 2350m2 concrete bund e) 3 No. Waste Storage Containers, each 80m2 (c. 3m wide x 26m length x 4m high) f) Diesel Generator with floor area of 32m2 (c. 4m wide x 8m length x 4m high) g) 2 No transformers each 160m2, & each measuring c. 8m wide x 10m length x 9m high h) a 830m2 Office & ancillary services building (c. 20 wide x 47 length x 6m high) i) a 570m2 Switchgear (MV) building (c. 13 wide x 54 length x 5m high) j) all other miscellaneous & ancillary site works, including:12 No. Car parking spaces & 3No unloading bays, widened & upgraded entrance from the R152, two lowered site platform areas & internal circulation road & hard & soft landscaping, a temporary construction compound, & palisade fencing. k) New road markings, including deceleration lane approaching the site, on the R152. The proposed development will include connection to public water & wastewater provision, supplied by Irish Water. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence & full details of the proposed development & its anticipated environmental impacts will be notified to the Environmental Protection Agency.The proposed development is planned to connect to a new 110kV substation to be located adjacent and to the south-west of the proposed OCGT Power Plant. A NIS accompanies the application. Significant
No Environment Impact Assesments Associated with this Application