Planning application details ref: LB190031 Meath CoCo

100%100% Complete (warning)

Planning Application: LB190031 (Meath CoCo)
File Number: LB190031
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 17/01/2019 Decision Due Date: 09/07/2019
Validated Date: 17/01/2019 Invalidated Date:
Further Info Requested: 13/03/2019 Further Info Received: 24/05/2019
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 05/07/2019
Leave to Appeal: Appeal Date: 31/07/2019
Commenced Date: Submissions By: 25/06/2019

Applicant Details

Applicant name: SSE Generation Ireland Ltd
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a 208MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant & comprises the following elements: a) 4 No containerised Peaker Plant units (each 248m2 and c. 8m wide x 31m long x 3.5m high), each housing a fully enclosed & roofed turbo generator comprising of 2No. turbines with a common generator, all on a concrete plinth of 615m2; b) Each unit has two exhaust stacks (15m in height) one for each turbine; c) Water treatment plant comprising: 275m2 Water Treatment (Demineralisation) Building (6m high x 11m wide x 25m long); a 120m2 raw water treatment tank of 1000m3 (c. 10m high); a 315m2 deionized (treated water) water storage tank (max. volume of 4900m3) c. 16m high; hydrochloric acid tank (5m3) c. 3m high; sodium hydroxide tank (2.5m3) c.2m high; waste water storage tank (40m3) (c.2.5m high); 25m2 Firewater Module measuring 5m wide x 5m length x 5m high; Foul water pump station (slab area of 121m2) d) 2 No Fuel storage tanks to each hold a maximum volume of 4,900m3 per tank (each c. 16m high), & associated fuel pumping & filtering equipment & pipework, all within a 2350m2 concrete bund e) 3 No. Waste Storage Containers, each 80m2 (c. 3m wide x 26m length x 4m high) f) Diesel Generator with floor area of 32m2 (c. 4m wide x 8m length x 4m high) g) 2 No transformers each 160m2, & each measuring c. 8m wide x 10m length x 9m high h) a 830m2 Office & ancillary services building (c. 20 wide x 47 length x 6m high) i) a 570m2 Switchgear (MV) building (c. 13 wide x 54 length x 5m high) j) all other miscellaneous & ancillary site works, including:12 No. Car parking spaces & 3No unloading bays, widened & upgraded entrance from the R152, two lowered site platform areas & internal circulation road & hard & soft landscaping, a temporary construction compound, & palisade fencing. k) New road markings, including deceleration lane approaching the site, on the R152. The proposed development will include connection to public water & wastewater provision, supplied by Irish Water. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence & full details of the proposed development & its anticipated environmental impacts will be notified to the Environmental Protection Agency.The proposed development is planned to connect to a new 110kV substation to be located adjacent and to the south-west of the proposed OCGT Power Plant. A NIS accompanies the application. Significant
Development Address: Carranstown & Caulstown, Platin, Duleek, Co. Meath
Architect Name: Lara Gough Location Key: CAULSTOWN
Electoral Division: Incorrect Icl Voter Recor Planner: Billy Joe Padden
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 05/07/2019 Manager Order: L1013/19
Decision Type: Conditional Number of Conditions: 29
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: a 208MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant & comprises the following elements: a) 4 No containerised Peaker Plant units (each 248m2 and c. 8m wide x 31m long x 3.5m high), each housing a fully enclosed & roofed turbo generator comprising of 2No. turbines with a common generator, all on a concrete plinth of 615m2; b) Each unit has two exhaust stacks (15m in height) one for each turbine; c) Water treatment plant comprising: 275m2 Water Treatment (Demineralisation) Building (6m high x 11m wide x 25m long); a 120m2 raw water treatment tank of 1000m3 (c. 10m high); a 315m2 deionized (treated water) water storage tank (max. volume of 4900m3) c. 16m high; hydrochloric acid tank (5m3) c. 3m high; sodium hydroxide tank (2.5m3) c.2m high; waste water storage tank (40m3) (c.2.5m high); 25m2 Firewater Module measuring 5m wide x 5m length x 5m high; Foul water pump station (slab area of 121m2) d) 2 No Fuel storage tanks to each hold a maximum volume of 4,900m3 per tank (each c. 16m high), & associated fuel pumping & filtering equipment & pipework, all within a 2350m2 concrete bund e) 3 No. Waste Storage Containers, each 80m2 (c. 3m wide x 26m length x 4m high) f) Diesel Generator with floor area of 32m2 (c. 4m wide x 8m length x 4m high) g) 2 No transformers each 160m2, & each measuring c. 8m wide x 10m length x 9m high h) a 830m2 Office & ancillary services building (c. 20 wide x 47 length x 6m high) i) a 570m2 Switchgear (MV) building (c. 13 wide x 54 length x 5m high) j) all other miscellaneous & ancillary site works, including:12 No. Car parking spaces & 3No unloading bays, widened & upgraded entrance from the R152, two lowered site platform areas & internal circulation road & hard & soft landscaping, a temporary construction compound, & palisade fencing. k) New road markings, including deceleration lane approaching the site, on the R152. The proposed development will include connection to public water & wastewater provision, supplied by Irish Water. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Directive (IED) licence & full details of the proposed development & its anticipated environmental impacts will be notified to the Environmental Protection Agency.The proposed development is planned to connect to a new 110kV substation to be located adjacent and to the south-west of the proposed OCGT Power Plant. A NIS accompanies the application. Significant

Appeal Details


Appeal Details
Notification Date: 02/08/2019 BP Reference #: 305028-19
Appeal Type: THIRD PARTY File Forward Date: 14/08/2019
Submission Due Date: 29/10/2019 Submission Sent Date: 25/10/2019
Appeal Decision: REFUSED Decision Date: 17/12/2019
Withdrawn Date: Dismissed Date:
Reason: