Planning application details ref: KA901377 Meath CoCo

100%100% Complete (warning)

Planning Application: KA901377 (Meath CoCo)
File Number: KA901377
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 01/09/2009 Decision Due Date: 08/03/2010
Validated Date: 01/09/2009 Invalidated Date:
Further Info Requested: 23/10/2009 Further Info Received: 09/02/2010
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 08/03/2010
Leave to Appeal: Appeal Date: 30/03/2010
Commenced Date: Submissions By:

Applicant Details

Applicant name: Shamrock Renewable Fuels Ltd.
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a bioenergy plant producing wood and energy crop biofuels, and green electricity for export to the national grid. The proposed development comprises of an extension of an established wood and energy crop storage, drying and processing facility manufacturing biofuel products, permitted under Meath County Council Reg. Refs. KA70057 and KA70610. It is proposed to store, dry and process plant biomass, wood and energy crops for the manufacture of briquettes and pellet biofuels. The proposed development includes for the introduction of an integrated combined heat and power (CHP) plant utilising wood and plant biomass fuels to generate the electrical power required for the bioenergy plant. Surplus electrical output will be exported to the national grid as green carbon-neutral electricity, and surplus recovered heat from the CHP process will be used in the biofuel drying process. The proposed development will include the following: material preparation and storage building (1,280sq.m); CHP plant building (2880sq.m) and associated emissions stack of 30m above ground level; wet chip silo and dryer building (1210sq.m); dried wood storage building (1280sq.m); solid biofuel manufacturing building (1280sq.m); maintenance and storage building (220sq.m); 2 No. hardstanding storage areas of 2.14ha and 7.78ha respectively; 2 No. water storage lagoons; ESB substation (84sq.m); ancillary two storey office building (870sq.m); weighbridge and weighbridge office (19sq.m); proprietary wastewater treatment system and associated percolation area; perimeter fence and landscaping; new vehicular entrance to the N52 national road and gated entrance avenue; and all associated development works and landscaping on an overall site area of 19.85ha. Significant further information/revised plans submitted for this application
Development Address: Balrath Demesne, Balrath, Kells, Co. Meath
Architect Name: Location Key: BALRATH DEMESNE
Electoral Division: Incorrect Icl Voter Recor Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 08/03/2010 Manager Order: K342/10
Decision Type: Conditional Number of Conditions: 40
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description: a bioenergy plant producing wood and energy crop biofuels, and green electricity for export to the national grid. The proposed development comprises of an extension of an established wood and energy crop storage, drying and processing facility manufacturing biofuel products, permitted under Meath County Council Reg. Refs. KA70057 and KA70610. It is proposed to store, dry and process plant biomass, wood and energy crops for the manufacture of briquettes and pellet biofuels. The proposed development includes for the introduction of an integrated combined heat and power (CHP) plant utilising wood and plant biomass fuels to generate the electrical power required for the bioenergy plant. Surplus electrical output will be exported to the national grid as green carbon-neutral electricity, and surplus recovered heat from the CHP process will be used in the biofuel drying process. The proposed development will include the following: material preparation and storage building (1,280sq.m); CHP plant building (2880sq.m) and associated emissions stack of 30m above ground level; wet chip silo and dryer building (1210sq.m); dried wood storage building (1280sq.m); solid biofuel manufacturing building (1280sq.m); maintenance and storage building (220sq.m); 2 No. hardstanding storage areas of 2.14ha and 7.78ha respectively; 2 No. water storage lagoons; ESB substation (84sq.m); ancillary two storey office building (870sq.m); weighbridge and weighbridge office (19sq.m); proprietary wastewater treatment system and associated percolation area; perimeter fence and landscaping; new vehicular entrance to the N52 national road and gated entrance avenue; and all associated development works and landscaping on an overall site area of 19.85ha. Significant further information/revised plans submitted for this application

Appeal Details


Appeal Details
Notification Date: 31/03/2010 BP Reference #: PL 17.236410
Appeal Type: THIRD PARTY File Forward Date: 08/04/2010
Submission Due Date: 20/09/2010 Submission Sent Date: 20/09/2010
Appeal Decision: REFUSED Decision Date: 10/11/2010
Withdrawn Date: Dismissed Date:
Reason: