Planning application details ref: ka110826 Meath CoCo

100%100% Complete (warning)

Planning Application: ka110826 (Meath CoCo)
File Number: ka110826
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 02/09/2011 Decision Due Date: 27/10/2011
Validated Date: 02/09/2011 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 27/10/2011
Leave to Appeal: Appeal Date: 22/11/2011
Commenced Date: Submissions By: 06/10/2011

Applicant Details

Applicant name: Shamrock Renewable Fuels Ltd.,
Applicant Address:
Phone Number: Fax Number: 0469293977
Corresp. Address:

Applicant Details


Proposed Development

Development Description: an extension of an established wood and energy crop storage, drying and processing facility manufacturing biofuel products, permitted under Meath County Council Reg. Refs. KA70057 and KA70610. It is proposed to store, dry and process plant biomass, wood and energy crops for the manufacture of briquettes and pellet biofuels. The proposed development includes for the introduction of an integraged combined heat and power (CHP) plant utilising wood and plant biomass fuels to generate the electrical power required for Bioenergy Plant. Surplus electrical output will be exported to the National Grid as green carbon-neutral electricity and surplus recovered heat from the CHP process will be used in the biofuel drying process. The proposed development will include the following: material preparation and storage building (1,280 sq.m.); CHP plant building (2,880 sq. m.) and associated emissions stack of 30 m above ground level; wet chip silo building (1,210 sq. m.) and wood chip dryer plant (1,335 sq. m.); dried wood storage building (1,280 sq. m.) solid biofuel manufacturing building (1,280 sq. m.); maintenance and storage building (220 sq. m.); 2 no. hardstanding storage areas of 2.14 ha and 7.78 ha, respectively; 2 no water storage lagoons; ESB substation (84 sq. m.); ancillary two storey office building (870 sq. m.); weighbridge and weighbridge office (19 sq. m.); proprietary wastewater treatment system and associated percolation area; perimeter fence and landscaping; new vehicular entrance to the N52 National Road and gated entrance avenue; ancillary car parking (78 no. spaces) and HGV parking spaces (8 no. spaces) and all associated development, works and landscaping on an overall site atea of 19.85 ha
Development Address: Balrath Demesne, Balrath, Kells, Co Meath
Architect Name: Location Key: BALRATH DEMESNE
Electoral Division: Incorrect Icl Voter Recor Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments: Partial refund issued - trans no.30196789-19/06/13

Decision

Decision Date: 27/10/2011 Manager Order: K1366/11
Decision Type: Conditional Number of Conditions: 36
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 14/10/2017
Decision Description: an extension of an established wood and energy crop storage, drying and processing facility manufacturing biofuel products, permitted under Meath County Council Reg. Refs. KA70057 and KA70610. It is proposed to store, dry and process plant biomass, wood and energy crops for the manufacture of briquettes and pellet biofuels. The proposed development includes for the introduction of an integraged combined heat and power (CHP) plant utilising wood and plant biomass fuels to generate the electrical power required for Bioenergy Plant. Surplus electrical output will be exported to the National Grid as green carbon-neutral electricity and surplus recovered heat from the CHP process will be used in the biofuel drying process. The proposed development will include the following: material preparation and storage building (1,280 sq.m.); CHP plant building (2,880 sq. m.) and associated emissions stack of 30 m above ground level; wet chip silo building (1,210 sq. m.) and wood chip dryer plant (1,335 sq. m.); dried wood storage building (1,280 sq. m.) solid biofuel manufacturing building (1,280 sq. m.); maintenance and storage building (220 sq. m.); 2 no. hardstanding storage areas of 2.14 ha and 7.78 ha, respectively; 2 no water storage lagoons; ESB substation (84 sq. m.); ancillary two storey office building (870 sq. m.); weighbridge and weighbridge office (19 sq. m.); proprietary wastewater treatment system and associated percolation area; perimeter fence and landscaping; new vehicular entrance to the N52 National Road and gated entrance avenue; ancillary car parking (78 no. spaces) and HGV parking spaces (8 no. spaces) and all associated development, works and landscaping on an overall site atea of 19.85 ha

Appeal Details


Appeal Details
Notification Date: 24/11/2011 BP Reference #: pl 17.239861
Appeal Type: THIRD PARTY File Forward Date: 29/11/2011
Submission Due Date: 24/01/2012 Submission Sent Date: 23/01/2012
Appeal Decision: CONDITIONAL Decision Date: 15/10/2012
Withdrawn Date: Dismissed Date:
Reason: