Planning Application: 2179 (Kildare County Council )
File Number:
2179
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
26/01/2021
Decision Due Date:
22/03/2021
Validated Date:
26/01/2021
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
18/03/2021
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
01/03/2021
Applicant Details
Applicant name:
EFIV Irish Property ICAV
Applicant Address:
Phone Number:
Fax Number:
23830267
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the change of use of the existing and permitted (Reg. Ref:. 95/923) Ancillary Production Support Office associated with part of Building No. 2 to a standalone independent Office use including break room and tea station (c. 1,139sqm). The proposed development specifically relates to Building No. 2 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application.) The site is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At a site of c.80.56 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
Development Address:
Barnhall Road,, Leixlip,, Co. Kildare.
Architect Name:
Tony Fennessy, RKD Architects
Location Key:
LEIXLIP
Electoral Division:
Planner:
Danielle Cantwell
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
18/03/2021
Manager Order:
DO32982
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
30/04/2021
Grant Managers Order #:
DO32982
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
29/04/2026
Decision Description:
the change of use of the existing and permitted (Reg. Ref:. 95/923) Ancillary Production Support Office associated with part of Building No. 2 to a standalone independent Office use including break room and tea station (c. 1,139sqm). The proposed development specifically relates to Building No. 2 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application.) The site is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At a site of c.80.56 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
At a site of c. 80.56 hectares, at Liffey Business Campus (formerly known as the Hewlett Packard Campus), Barnhall Road,
The proposed development specifically relates to Building No. 3 and Building No. 4 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application). The development for which retention permission is sought consists of: the change of use of Building No. 3 from its permitted warehouse use (Reg. Ref. 95/923) to manufacturing use (4,421 sq. m gross floor area including ancillary offices at ground floor and first floor level); and the change of use of part of Building No. 4 from its permitted manufacturing use (Reg. Ref. 95/923) to office use (9,002 sq. m gross floor area ). The development for which retention permission is sought also consists of: the provision of ancillary office space at first floor level within Building No. 4 (246 sq. m gross floor area); and all other associated site development works above and below ground. The site is principally bounded by; Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west
the construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)