File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
2179 |
APPLICATION FINALISED |
PERMISSION |
C |
26/01/2021 Tuesday |
EFIV Irish Property ICAV |
Barnhall Road, Leixlip, Co. Kildare. |
the change of use of the existing and permitted (Reg. Ref:. 95/923) Ancillary Production Support Office associated with part of Building No. 2 to a standalone independent Office use including break room and tea station (c. 1,139sqm). The proposed development specifically relates to Building No. 2 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application.) The site is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At a site of c.80.56 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus) |
221096 |
APPLICATION FINALISED |
PERMISSION |
C |
06/09/2022 Tuesday |
The Davy Platform ICAV, |
Kildare Innovation Campus, Barnhall Road, Leixlip, |
development of 4 No. 20 kV ESB double substations at four sites of c. 591 sqm in total (Site 1, c. 138 sqm adjacent to Building 4; Site 2, c. 138 sqm adjacent to Building 2 and Building 5; Site 3, c. 138 sqm adjacent to Building 5; and Site 4, c. 177 sqm partially within Building 9, at the Kildare Innovation Campus (formerly known as the Hewlett Packard Campus) Barnhall Road, Leixlip, Co. Kildare. The wider Kildare Innovation Campus is c. 80 hectares. The wider Campus is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and grounds associated with Castletown House to the west. The proposed development will consist of: the construction of 3 No. standalone ESB double substations and associated LV switch rooms (Substations No. 1-3) of c. 3m in height, c. 4.8m in depth, and c. 17.8m in width, with an individual gross floor area of 57.5 sqm; and all associated works above and below ground. Substation No. 4 (gross floor area of 57.5 sqm) will include: internal alterations to the existing Campus Building No. 9; associated LV switch rooms; the removal of existing louvre and replacement with substation access doors on the southeast elevation; access path; and all associated works above and below ground. The cumulative gross floor area of the development will be 230 sqm |
95923 |
APPLICATION FINALISED |
PERMISSION |
C |
07/07/1995 Friday |
Hewlett Packard Manufacturing Ltd. |
Barnhall, Parsonstown, Rinawade Upper & Lower townlands, near Leixlip |
Manufacturing facility of 42,640 sq. m. & development of an overall site of 80.56 hectares for industrial purposes incl. site entrances & SEE NOTICE |
96411 |
APPLICATION FINALISED |
APPROVAL |
C |
29/03/1996 Friday |
Hewlett Packard Manufacturing Ltd. |
Barnhall, Parsonstown, Rinawade Upper & Rinawade Lower, near Leixlip |
Alterations to previously approved plans for a manufacturing facility & development of an oversite for industrial purposes as follows: 1. Exts. ETC... |
961006 |
APPLICATION FINALISED |
PERMISSION |
C |
09/07/1996 Tuesday |
Hewlett Packard Manufacturing Ltd. |
Barnhall, Parsonstown, Rinawade Upr. & Lower townlands near Leixlip |
Alterations to previously approved plans for a manufacturing facility & dev. of an overall site for ind. purposes as follows: Erect 4 roof mounted ETC |