File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
19524 |
INCOMPLETED APPLICATION |
PERMISSION |
|
08/11/2019 Friday |
CLONCANT RENEWABLE ENERGY LIMITED |
BALLYKILLEEN, SHEAN, KILCUMBER, CLONCANT, CUSHALING AND RATHMORE, EDENDERRY AND BALLINA, GEASHILL, CO OFFALY AND TICKNEVIN, CARBURY, CO. KILDARE |
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A TOTAL SITE AREA OF 63.9 HECTARES . THE DEVELOPMENT WILL CONSIST OF UP TO 9 NO. WIND TURBINES (8 IN CO. OFFALY, 1 IN CO. KILDARE), WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO TEMPORARY BLADE ADAPTER SET-DOWN AREAS, TURBINE DELIVERY ROUTE WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION |
19568 |
INCOMPLETED APPLICATION |
PERMISSION |
|
28/11/2019 Thursday |
CLONCANT RENEWABLE ENERGY LTD |
BALLYKILLEEN, SHEAN, KILCUMBER, CLONCANT AND CUSHALING EDENDERRY CO OFFALY |
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 ( EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION |
19606 |
APPLICATION FINALISED |
PERMISSION |
R |
19/12/2019 Thursday |
CLONCANT RENEWABLE ENERGY LIMITED |
BALLYKILLEEN, SHEAN, KILCUMBER, CLONCANT & CUSHALING EDENDERRY CO OFFALY |
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 (EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION |
98415 |
APPLICATION FINALISED |
PERMISSION |
R |
20/05/1998 Wednesday |
PADDY USHER |
KILCUMBER CLONBULLOGUE
|
EXTENSION TO SIDE AND REAR OF EXISTING COTTAGE, SEPTIC TANK AND EFFLUENT TREATMENT SYSTEM |
99200 |
APPLICATION FINALISED |
PERMISSION |
R |
25/02/1999 Thursday |
PATRICK & ANGELA USHER |
KILCUMBER CLONBULLOGUE
|
EXTENSION TO EXISTING DWELLINGHOUSE & SEPTIC TANK |