Planning Application: 19568 (Offaly County Council )
File Number:
19568
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
28/11/2019
Decision Due Date:
Validated Date:
Invalidated Date:
28/11/2019
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
CLONCANT RENEWABLE ENERGY LTD
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 ( EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION
Development Address:
BALLYKILLEEN, SHEAN, KILCUMBER, CLONCANT AND CUSHALING, EDENDERRY, CO OFFALY
BALLINOWLART NORTH, BALLYKILLEN, KILCUMBER, CLONCANT AND CUSHALING EDENDERRY CO. OFFALY
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT WITH A TOTAL SITE AREA OF CIRCA 117.47 HECTARES, TO INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW ACCESS TRACKS, UNDERGROUND CABLING, PERIMETER FENCING WITH CCTV CAMERAS, 22 NO. MV POWER STATIONS, TEMPORARY CONSTRUCTION COMPOUNDS AND ALL ANCILLARY GRID INFRASTRUCTURE AND ASSOCIATED WORKS. THE SOLAR FARM WOULD BE OPERATIONAL FOR 40 YEARS
BALLYKILLEEN, SHEAN, KILCUMBER AND BALLINOWLART NORTH CO. OFFALY
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (D) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (E) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
No Environment Impact Assesments Associated with this Application