Planning application details ref: 09149 Offaly County Council

100%100% Complete (warning)

Planning Application: 09149 (Offaly County Council )
File Number: 09149
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 09/04/2009 Decision Due Date: 03/06/2009
Validated Date: 09/04/2009 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 02/06/2009
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: BORD NA MONA PLC
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: ALTERATIONS TO THE EXISTING 110KV CUSHALING STATION TO INCLUDE THE INSTALLATION OF TWO NEW 110KV LINE BAYS, ASSOCIATED SURGE ARRESTORS CIRCUIT BREAKERS DISCONNECTS, CURRENT AND VOLTAGE TRANSFORMERS. MODIFICATION OF THE EXISTING COUPLER CUBICLE TO INCLUDE A CIRCUIT BREAKER AND CURRENT TRANSFORMER. ANCILLARY WORKS WILL INCLUDE ALTERATIONS TO THE EXISTING INNER AND OUTER COMPOUND FENCES. EXTENSION TO THE EXISTING CONTROL ROOM TO ACCOMMODATE THE CONTROL CABINETS FOR THE EXTENSION WORKS. RELOCATION OF THE EXISTING SEPTIC TANK, PURAFLO TREATMENT SYSTEM AND PERCOLATION AREA
Development Address: BALLYKILLEEN, EDENDERRY, CO OFFALY
Architect Name: TOM EGAN Location Key: EDENDERRY
Electoral Division: Planner: Ed Kelly
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 02/06/2009 Manager Order:
Decision Type: Conditional Number of Conditions: 2
Grant Date: 07/07/2009 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 06/07/2014
Decision Description: ALTERATIONS TO THE EXISTING 110KV CUSHALING STATION TO INCLUDE THE INSTALLATION OF TWO NEW 110KV LINE BAYS, ASSOCIATED SURGE ARRESTORS CIRCUIT BREAKERS DISCONNECTS, CURRENT AND VOLTAGE TRANSFORMERS. MODIFICATION OF THE EXISTING COUPLER CUBICLE TO INCLUDE A CIRCUIT BREAKER AND CURRENT TRANSFORMER. ANCILLARY WORKS WILL INCLUDE ALTERATIONS TO THE EXISTING INNER AND OUTER COMPOUND FENCES. EXTENSION TO THE EXISTING CONTROL ROOM TO ACCOMMODATE THE CONTROL CABINETS FOR THE EXTENSION WORKS. RELOCATION OF THE EXISTING SEPTIC TANK, PURAFLO TREATMENT SYSTEM AND PERCOLATION AREA

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: