Planning application details ref: 071691 Offaly County Council

100%100% Complete (warning)

Planning Application: 071691 (Offaly County Council )
File Number: 071691
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 10/12/2007 Decision Due Date: 12/02/2008
Validated Date: 10/12/2007 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 12/02/2008
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: BORD NA MONA PLC
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: THE DEVELOPMENT WILL CONSTIST OF TWO ELECTRICITY GENERATION UNITS EACH HAVING A MAXIMUM POWER OUTPUT OF 52 MEGAWATTS. EACH POWER UNIT WILL INCLUDE AN AIR INLET FILTER, A TURBINE GENERATOR SET AND AUXILIARY SYSTEMS INCLUDING CONTROL SYSTEM AND ELECTRICAL EQUIPMENT. GASEOUS EMISSIONS FORM EACH POWER UNIT WILL BE DISCHARGED THROUGH TWO EXHAUST STACKS. SUPPORTING FACILITIES WILL ALSO BE INSTALLED AND WILL INCLUDE TRANSFORMERS, WATER STORAGE TANKS, FUEL STORAGE TANKS, AND FUEL AND WATER FORWARDING PUMPS. THE POWER UNITS WILL BE LOCATED ON A CONCRETE AREA. AN ENVIRONMENTAL IMPACT STATEMENT (E.I.S.) HAS BEEN PREPARED IN RESPECT OF THE PLANNING APPLICATION. THIS APPLICATION RELATES TO DEVELOPMENT THAT COMPRISES OR IS FOR THE PURPOSE OF AN ACTIVITY IN RELATION TO WHICH A LICENCE UNDER PART IV OF THE ENVIRONMENTAL PROTECTION AGENCY ACT, 1992 AS AMENDED IS REQUIRED
Development Address: BALLYKILLEEN, EDENDERRY, CO OFFALY
Architect Name: GERRY KELLY Location Key: EDENDERRY
Electoral Division: Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 12/02/2008 Manager Order:
Decision Type: Conditional Number of Conditions: 4
Grant Date: 25/03/2008 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 24/03/2013
Decision Description: THE DEVELOPMENT WILL CONSTIST OF TWO ELECTRICITY GENERATION UNITS EACH HAVING A MAXIMUM POWER OUTPUT OF 52 MEGAWATTS. EACH POWER UNIT WILL INCLUDE AN AIR INLET FILTER, A TURBINE GENERATOR SET AND AUXILIARY SYSTEMS INCLUDING CONTROL SYSTEM AND ELECTRICAL EQUIPMENT. GASEOUS EMISSIONS FROM EACH POWER UNIT WILL BE DISCHARGED THROUGH TWO EXHAUST STACKS. SUPPORTING FACILITIES WILL ALSO BE INSTALLED AND WILL INCLUDE TRANSFORMERS, WATER STORAGE TANKS, FUEL STORAGE TANKS, AND FUEL AND WATER FORWARDING PUMPS. THE POWER UNITS WILL BE LOCATED ON A CONCRETE AREA. AN ENVIRONMENTAL IMPACT STATEMENT HAS BEEN PREPARED IN RESPECT OF THE PLANNING APPLICATION. THIS APPLICATION RELATES TO DEVELOPMENT THAT COMPRISES OR IS FOR THE PURPOSE OF AN ACTIVITY IN RELATION TO WHICH A LICENCE UNDER PART IV OF THE ENVIRONMENTAL PROTECTION AGENCY ACT, 1992 AS AMENDED IS REQUIRED

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: