Planning application details ref: 2360108

100%100% Complete (warning)



File Number 2360108
Application Type PERMISSION Planning Status APPLICATION FINALISED
Received Date 14/08/2023 Decision Due Date 08/10/2023
Validated Date 14/08/2023 Invalidated Date
Further Info Requested Further Info Received
Withdrawn Date Extend Date
Decision Type Conditional Decision Date 25/09/2023
Leave to Appeal Appeal Date
Commenced Date Submissions By 17/09/2023

Applicant Details

Applicant name EirGrid plc
Applicant address
Phone Number Fax Number
Corresp. Address

Applicant Details


Proposed Development

Development Description the proposed development within Co. Longford will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the retention and refurbishment, steel member replacement, painting and foundation strengthening of the one retained end mast EM1, including the replacement of hardware and fittings, replacement of vibration dampers, and replacement of insulators at EM1; • The cutting of timber / vegetation; • all associated works within the existing Lanesboro 110kV substation to accommodate the uprated 110kV OHL including uprating of the Sliabh Bawn bay in Lanesboro 110kV substation and alterations to existing hardware; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings
Development Address Lanesborough Town , and Aghamore Townland, County Longford
Architect Name Location Key LANESBORO
Electoral Division Planner Ian Lacey
Social Housing Exempt Plan Enforcement #
IPC IPC Licence Required No Waste Licence Required No
Protected Structure No Protected Structure #
Development Name

Proposed Development


Comments

Significant Case Flag Comments

Decision

Decision Date 25/09/2023 Manager Order 30332
Decision Type Conditional Number of Conditions 12
Grant Date 27/10/2023 Grant Managers Order # 30332
Section 47 Apply? Part 5 Apply?
Expiry Date 26/10/2028
Decision Description the proposed development within Co. Longford will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the retention and refurbishment, steel member replacement, painting and foundation strengthening of the one retained end mast EM1, including the replacement of hardware and fittings, replacement of vibration dampers, and replacement of insulators at EM1; • The cutting of timber / vegetation; • all associated works within the existing Lanesboro 110kV substation to accommodate the uprated 110kV OHL including uprating of the Sliabh Bawn bay in Lanesboro 110kV substation and alterations to existing hardware; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings

Appeal Details


Appeal Details
Notification Date BP Reference #
Appeal Type File Forward Date
Submission Due Date Submission Sent Date
Appeal Decision Decision Date
Withdrawn Date Dismissed Date
Reason