Planning Application: 2018 (Tipperary County Council )
File Number:
2018
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
14/01/2020
Decision Due Date:
19/08/2020
Validated Date:
14/01/2020
Invalidated Date:
Further Info Requested:
06/03/2020
Further Info Received:
25/06/2020
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
18/08/2020
Leave to Appeal:
Appeal Date:
14/09/2020
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Brookfield Renewable Ireland Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
development consisting of the installation of battery arrays, located within container units (18 number units, each 30m2 by c.2.6m tall), a control building (c.160.5m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)
development consisting of the installation of battery arrays, located within container units (18 number units, each 30m2 by c.2.6m tall), a control building (c.160.5m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)
the development of 26MW wind farm comprising 13 no. 2 MW wind turbines with steel towers and composite fibre rotor blades of hub height up to 67 metres, a rotor diameter of up to 80 metres and base to blade-tip height of up to 107 metres, also including wind turbines transformers, turbine hardstands, new access roads, strengthening and widening of existing forestry access roads; drainage; a substation control building with fenced compound for electrical equipment; underground electrical cables linking the turbines with the substation compound; underground communication cables, and all associated site works and ancillary development. An Environment Impact Statement is submitted with this application. This development is within the townslands of Curraghmarky, Birchgrove, Moanvaun, Garracummer, Cummer More, Cummer Beg
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning permission ref: 12/77 and extended under planning permission ref: 15600530, for the purposes of monitoring wind and climate conditions at Garracummer windfarm granted permission under planning ref: 04/1259 and ABP PL.23.215597
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS)