File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
041259 |
APPLICATION FINALISED |
PERMISSION |
C |
01/10/2004 Friday |
Garracummer Wind Farm Limited |
Glengar/Curragheen Hollyford Co Tipperary |
the development of 26MW wind farm comprising 13 no. 2 MW wind turbines with steel towers and composite fibre rotor blades of hub height up to 67 metres, a rotor diameter of up to 80 metres and base to blade-tip height of up to 107 metres, also including wind turbines transformers, turbine hardstands, new access roads, strengthening and widening of existing forestry access roads; drainage; a substation control building with fenced compound for electrical equipment; underground electrical cables linking the turbines with the substation compound; underground communication cables, and all associated site works and ancillary development. An Environment Impact Statement is submitted with this application. This development is within the townslands of Curraghmarky, Birchgrove, Moanvaun, Garracummer, Cummer More, Cummer Beg |
071069 |
APPLICATION FINALISED |
PERMISSION |
C |
19/06/2007 Tuesday |
Michael Ryan |
Moanvaun Glengar Hollyford |
construction of 1 No. wind turbine with steel tower and composite fibre rotor blades of 67 metres hub height , blade radius of 40 meteres/80 meters diameter, with overall blade tip height of 107 meteres(relating to the same site as previously applied for Planning Ref 06/1452) and including wind turbine transformer, turbine hardstand, access track, under-grounded electrical cables, underground communication cable and all associated site works and ancillary development |
17601085 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
R |
28/09/2017 Thursday |
Michael Ryan |
Moanvaun Glengar Hollyford |
construction of 1 No. wind turbine with steel tower and composite fibre rotor blades of 67 metres hub height , blade radius of 40 meteres/80 meters diameter, with overall blade tip height of 107 meteres(relating to the same site as previously applied for Planning Ref 06/1452) and including wind turbine transformer, turbine hardstand, access track, under-grounded electrical cables, underground communication cable and all associated site works and ancillary development |
18600988 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2018 Wednesday |
Garracummer Wind Farm Limited |
Cummer Beg, Garracummer, Birchgrove, Moanvaun, Curraghmarky & Cummermore Hollyford Co. Tipperary |
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning permission ref: 12/77 and extended under planning permission ref: 15600530, for the purposes of monitoring wind and climate conditions at Garracummer windfarm granted permission under planning ref: 04/1259 and ABP PL.23.215597 |
19601283 |
INCOMPLETED APPLICATION |
PERMISSION |
|
18/11/2019 Monday |
Brookfield Renewable Ireland Ltd |
Garracummer Wind Farm Kilcommon Cross Moanvaun, Hollyford |
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS) |
2018 |
APPLICATION FINALISED |
PERMISSION |
C |
14/01/2020 Tuesday |
Brookfield Renewable Ireland Ltd |
Garracummer Wind Farm Kilcommon Cross Moanvaun, Hollyford |
development consisting of the installation of battery arrays, located within container units (18 number units, each 30m2 by c.2.6m tall), a control building (c.160.5m2 by c.6.4m tall) and transformer (c.5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The overall development site is c.2.6Ha. The application includes a Natura Impact Statement (NIS) |