one no. temporary meteorological mast of 70 metres in height for the limited purpose of monitoring wind and climate conditions for the development referenced in North Tipperary County Council Pl. Ref. 06510773 and ABP PL 22.222142. Permission for a period of 3 years is requested
one no. temporary meteorological mast of 70 metres in height for the limited purpose of monitoring wind and climate conditions for the development referenced in North Tipperary County Council Pl. Ref. 06510773 and ABP PL 22.222142. Permission for a period of 3 years is requested
Barnalisheen, Cooleeny, Derryfada, Derryville and Killoran
22 No. wind turbine generators, access roads, craneage pads and associated infrastructure. An environmental Impact Statement has been submitted with this application.
1 no. meteorological mast of 61.5m in height (pl ref 03/51/1001) for the limited purpose of monitoring wind and climate conditions for development referenced in planning application 06/51/0773
develop the Derryville Island Ore Deposit underground workings as an extension to the existing Lisheen Mine and the construction of 1 No. ventilation shaft. The Lisheen Mine is subject to the conditions of IPPCL No. P0099-03. The development will include underground mine workings, as an extension to the existing Lisheen Mine and the construction of 1 No. ventilation shaft and associated surface building. An EIS shall be submitted to the planning authority with the application. The Major Accident Regulations apply to the proposed development.
twelve month extension of the permitted planning lifetime for one existing temporary meteorological mast of 70m in height (planning permission ref 10/51/0288) for the limited purpose of monitoring wind and climate conditions for the development referenced in Planning Permission Ref 06510773 & ABP PL 22.222142 for lands
Cooleeney and Derryfadda Moyne Thurles, Co. Tipperary
building (3657 sq m) with a car park and access road, commercial yard area and access road, truck prep building (110 sq m), 2 m high boundary architectural fence, signage, public lighting, solar panels to the building roof, an on-site waste water treatment system and associated polishing filter bed percolation area, rainwater harvesting tank, emergency storage tank, attenuation tank, bored well and all associated site works - application is accompanied by a Natura Impact Statement (NIS)
No Environment Impact Assesments Associated with this Application