File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
09510100 |
APPLICATION FINALISED |
PERMISSION |
C |
27/02/2009 Friday |
SWS Energy Ltd |
Barnalisheen, Derryville, Killoran, Cooleeny Derryfadda, Co. Tipperary |
12 no wind turbines (hub height 95m, blade diameter 90m), with an overall height from ground to blade tip of 140m, the use of 3 no. new borrow pits, construction of internal site tracks, upgrade of existng access track and associated works as an extension to Lisheen Wind Farm (Pl Ref no 06/51/0773, ABP Ref PL22.222142). An EIS has been submitted with this application. |
10510288 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
24/06/2010 Thursday |
Lisheen Windfarm Ltd., |
Cooleeny Moyne Co. Tipperary |
one no. temporary meteorological mast of 70 metres in height for the limited purpose of monitoring wind and climate conditions for the development referenced in North Tipperary County Council Pl. Ref. 06510773 and ABP PL 22.222142. Permission for a period of 3 years is requested |
12510034 |
APPLICATION FINALISED |
PERMISSION |
C |
31/01/2012 Tuesday |
Lisheen Mine |
Derryville Moyne Templetuohy |
develop the Derryville Island Ore Deposit underground workings as an extension to the existing Lisheen Mine and the construction of 1 No. ventilation shaft. The Lisheen Mine is subject to the conditions of IPPCL No. P0099-03. The development will include underground mine workings, as an extension to the existing Lisheen Mine and the construction of 1 No. ventilation shaft and associated surface building. An EIS shall be submitted to the planning authority with the application. The Major Accident Regulations apply to the proposed development. |
13510275 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2013 Thursday |
Lisheen Milling Limited |
Killoran Thurles Co. Tipperary |
consisting of modification of the permitted water impoundment facility (permitted under An Bord Pleanala Ref. No. PL22.100093 (North Tipperary County Council Reg. Ref. PLC17663) including use of the facility to provide for the storage and management of mine tailings within the same structure (for the purposes of extending life of mine), and associated capping and reinstatement activities. The proposed development also includes: the installation of spigots and reclaim pumps; and all other ancillary site development works. An Environmental Impact Statement (EIS) and Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the Planning Application. The application relates to development which comprises, or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence under the Environmental Protection Agency Acts, 1992 to 2013 (EPA Licence Reg. No. P0088-03) |
14600396 |
APPLICATION FINALISED |
PERMISSION |
C |
29/10/2014 Wednesday |
Lisheen Milling Limited |
Killoran Moyne, Thurles Co. Tipperary |
an increase in height of the existing Tailings Management Facility (TMF), previously permitted under Reg. No. 13/510275, granted in 2013 (small adjoining cell to the main TMF). The raise in height of this adjoining cell, from c. 131.5 mod up to aa maximum of c. 136.5 mod, will provide additional storage for the management of mine tailings for the purposes of extending the life of the mine, abd will result in an increase in the footprint of the TMF of c 2.25 hectares. The development also includes all related ancillary development works. This application is accompanied by an Environmental Impact Statement(EIS) & Natura Impact Statement(NIS) and relates to an activity requiring an Integrated Pollution Control Licence |
14600480 |
APPLICATION FINALISED |
PERMISSION |
C |
03/12/2014 Wednesday |
Lisheen Milling Limited |
Barnalisheen Thurles |
consist of re-opening of a borrow area, previously permitted under Planning Ref No PLC/17663. Aggregate materials (soil, stone & Rock) extracted from the borrow area will be used for on-site works, rehabilitation & future closure related activities, at Lisheen Mine. Aggregate extraction activities will be undertaken over an extension area of approx 13.5m within an overall site area of approx 27.5h. The maximum quantum of material to be extracted will be approx 1000000m3. Extraction activities will cease once closure activites at Lisheen Mine are completed as previously premitted under Ref No PLC/17663. The borrow area will then be rehabilitated. The development also include all related ancillary site works. An EIS & NIS have been submitted. The application relates to development which comprises, or is for the purposes of an activity requiring an IPCL under the EPA Acts 1992-2013(EPA Licence No P0088-04) |
21709 |
APPLICATION FINALISED |
PERMISSION |
C |
19/05/2021 Wednesday |
Revive Environmental Holdings Ltd. |
Cooleeney and Derryfadda Moyne Thurles, Co. Tipperary |
building (3657 sq m) with a car park and access road, commercial yard area and access road, truck prep building (110 sq m), 2 m high boundary architectural fence, signage, public lighting, solar panels to the building roof, an on-site waste water treatment system and associated polishing filter bed percolation area, rainwater harvesting tank, emergency storage tank, attenuation tank, bored well and all associated site works - application is accompanied by a Natura Impact Statement (NIS) |