development at the existing centre of excellence site, for the promotion of games and activities of Cumann Luthchleas Gael. The development will consist of a new, one / part two storey centre of excellence pavillion building, (previously granted planning permission ref. numbers TA/30408 & TA/60365) including dressing rooms, conference and coaching facilities, meeting rooms, dining, gymnasium and ancillary accommodation with new internal road, car parking, connection to existing wastewater treatment plant and all associated ancillary site works and services
Development Address:
Dunganny, Co. Meath
Architect Name:
Cooney Architects
Location Key:
DUNGANNY
Electoral Division:
Incorrect Icl Voter Recor
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Significance of further information yet to be determined.
Decision
Decision Date:
09/05/2014
Manager Order:
T455/14
Decision Type:
Conditional
Number of Conditions:
13
Grant Date:
20/06/2014
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
19/06/2019
Decision Description:
development at the existing centre of excellence site, for the promotion of games and activities of Cumann Luthchleas Gael. The development will consist of a new, one / part two storey centre of excellence pavillion building, (previously granted planning permission ref. numbers TA/30408 & TA/60365) including dressing rooms, conference and coaching facilities, meeting rooms, dining, gymnasium and ancillary accommodation with new internal road, car parking, connection to existing wastewater treatment plant and all associated ancillary site works and services
erect temporary changing rooms and associated facilities at the Centre of Excellence for the promotion of games and activities of Cumann Luthchleas Gael. The development will consist of changing facilities accommodated in 3 number steel prefabricated units manufactured by Secure-Cabin Ltd. Each unit measuring 18.3m by 3.05m contains two number changing areas, showers and toilet facilities. The floor area proposed is 167.5 square metres. Electrical power will be provided by generators. An advanced treatment system with intergrated pumping to a raised polishing filter will be installed to treat effluent
No Environment Impact Assesments Associated with this Application