(i) retention of extensions to the side chill in three units of c. 155m2 and c. 143m2 and c. 46m2 and extension to the existing lairage of c. 237m2; (ii) retention of change of use of separate lairage extension of c. 153m2 from agricultural use to commercial use; (iii) retention of ancillary development comprising c. 93m2 of existing green offal chills, c. 301m2 of existing office and staff welfare facilities, 3 no. separate surface parking areas to accommodate 51 no. surface car parking spaces and 6 no. delivery/dispatch vehicles, together with lairage yard extension of c. 1025m2 and associated site infrastructure works. Planning permission is also sought for works required to facilitate rain water harvesting, enhancement of water supply and upgrading of on-site drainage and surface water management infrastructure. The application relates to development for the purpose of an activity requiring and Integrated Pollution Prevention and Control Licence
a two storey extension to the front and rear of existing abattoir and all auxiliary site works and services. Further Information/revised plans submitted with revisions including revised site boundaries, new car parking spaces, to fill in existing septic tank and to install a new BAF sewerage treatment system and also to install 2 no. underground storage tanks under current planning ref no.SA20110
(i) retention of extensions to the side chill in three units of c. 155m2 and c. 143m2 and c. 46m2 and extension to the existing lairage of c. 237m2; (ii) retention of change of use of separate lairage extension of c. 153m2 from agricultural use to commercial use; (iii) retention of ancillary development comprising a trailer port, c. 93m2 of existing green offal chills, c. 301m2 of existing office and staff welfare facilities, 3 no. separate surface parking areas to accommodate 51 no. surface car parking spaces and 6 no. delivery/dispatch vehicles, together with lairage yard extension of c. 1025m2 and associated site infrastructure works. Planning permission is also sought for works required to facilitate rain water harvesting, enhancement of water supply and upgrading of on-site drainage and surface water management infrastructure. The application relates to development for the purpose of an activity requiring an Integrated Pollution Prevention and Control Licence
2 No. effluent Aeration tanks, control building and additional smaller storage tanks for effluent treatment purposes. An Integrated Pollution Control licence has been applied for. Further information/revised plans submitted for this application
No Environment Impact Assesments Associated with this Application