File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
21677 |
APPLICATION FINALISED |
PERMISSION |
C |
14/04/2021 Wednesday |
MSD International GmbH t/a MSD Ireland(Dunboyne Biologics) |
Piercetown, Cradockstown & Ballymagillin Townlands Dunboyne |
extensions to and modifications of the existing planning permission Ref RA170887. The development consists of the construction of a proposed Biopharmaceutical Manufacturing and Research Facility as described hereunder. 1) A single storey with mezzanine Biopharmaceutical Manufacturing and Research Facility sized approximately 17,500 square metres and approximately 14.5 metres high, located to the north of the existing manufacturing building including docks and yard-based plant and equipment and roof mounted stacks, equipment and vents and including 2no. boiler stacks approximately 27 metres high. 2) A single storey , partially glazed pedestrian link approximately 4 metres high. 3) A three-storey canteen and laboratory extension located to the south of the existing laboratory, administration and canteen block sized 1,020 square metres approximately and 21 metres high, including roof mounted plant and equipment. 4) The relocation of 2no. single storey modular liquid supply and waste stores to the east of the existing warehouse, both sized approximately 30 square metres and approximately 3 metres high. 5) The demolition of the existing single storey waste store located in the utilities to the north east of the existing faciility, sized approximately 235 square metres and approximately 4.7 metres high and the construction of a new waste store to the south of the proposed facility, sized approximately 235 square metres and approximately 4.7 metres high 6) An extension to the west side of the existing single storey ESB substation located adjacent to the southern site vehicular entrance gates, sized approximately 35 square metres and approximately 4.5 metres high. 7) The addition of 162 permanent car parking spaces, bringing the site to a total of 524 permanent car parking spaces and a dedicated shuttle bus parking area and shelter and including 8 disabled car parking spaces and including 16 electric vehicle charging spaces and including 36 cycle parking spaces, including the re-use of approximately 460 existing temporary construction related car parking spaces. 8) A landscaped berm approximately 8 metres high located to the rear (east) of the existing manufacturing site. 9) An additional utilities yard, housing plant and equipment, located to the south west of the proposed facility. 10) Alterations and extensions to existing roads and site works. These works include the use of existing temporary construction facilities and the extension of these temporary |
RA161021 |
APPLICATION FINALISED |
PERMISSION |
C |
20/09/2016 Tuesday |
Shire Pharmaceuticals (Ireland) Limited |
Piercetown, Craddockstown and Ballymagillin Townlands Dunboyne County Meath |
a Biopharmaceutical Manufacturing Facility located at our site at Piercetown, Cradockstown and Ballymagillin Townlands, Dunboyne, County Meath, including the following:- A two storey Biopharmaceutical Production Building sized 17,445 square metres in total and 19.5 metres high with roof mounted plant and equipment. This building will be built in 2 Phases. Phase 1 is sized 13,989 square metres and Phase 2 is sized 3,456 square metres. A two storey Warehouse Facility sized 8,517 square metres in total and 17.2 metres high with roof mounted plant and equipment and associated docking and yard areas. This building is to be built in 2 Phases. Phase 1 is sized 7,627 square metres and Phase 2 is sized 890 square metres. A single storey combined utility building sized 3,995 square metres and 10.4 metres high with internal mezzanines and with roof mounted plant and equipment including 8 no. boiler stacks 22.5 metres high. A three storey laboratory and administration building sized 12,453 square metres and 22 metres high including roof mounted penthouse and plant and equipment. A permanent staff and visitor car park for 496 cars and a temporary construction related car park for 420 cars. The temporary car park will be decommissioned upon completion of the facility. A single storey link building sized 1,751 square metres and 12.4 metres high. Ancillary site works include a bunded tank farm, water and waste water and oil storage tanks, pipe bridges, cooling towers, gas storage facilities, emergency generators, a waste recycling compound and structure, items of plant and equipment and their associated yards, internal roads and services, fencing, exterior lighting, landscaping and landscape berms, surface water attenuation ponds and building mounted and ground mounted signage. Ancillary site buildings include a single storey sprinkler pump house sized 91 square metres and 6.2 metres high and associated tanks, a single storey electrical building sized 65 square metres and 6.2 metres high, a single storey waste water pump house sized 7 square metres and 3.2 metres high, a gas reducing station and compound, a covered bicycle facility for 100 bicycles and 3 no. flagpoles 15 metres high, and a single storey bunded drum storage building sized 122 square metres and 6.2 metres high and a single storey waste water building sized 60 square metres and 6.2 metres high. Site access works including a new main truck and car entrance incorporating a .... |
RA190854 |
APPLICATION FINALISED |
PERMISSION |
C |
01/07/2019 Monday |
Shire Pharmaceuticals Ireland Limited |
Piecretown, Cradockstown & Ballymagillin Townlands Dunboyne Co. Meath |
temporary development located at our site at Piecretown, Cradockstown & Ballymagillin Townlands, Dunboyne, Co. Meath, including the following: - The continued use for a period of 5 years, of two existing temporary contractor-related portacabins. The temporary portacabins consist of: - A two storey structure sized 3,326 square meters and 10.6 meters high, and - a two storey structure sized 1,172 square meters and 7.1 meters high, both located to the rear of the site - The application also includes the continued use of a temporary contractor car park and yard area of up to 288 cars in a gravelled area, and the de-commissioning of the remaining (168No.) temporary car spaces. These car spaces will be utilised according to need and will be closed off when not in use. - The proposed works include site works, landscaping, drainage and site lighting and all necessary services |