Planning application details ref: RA161021 Meath CoCo

100%100% Complete (warning)

Planning Application: RA161021 (Meath CoCo)
File Number: RA161021
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 20/09/2016 Decision Due Date: 14/11/2016
Validated Date: 20/09/2016 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 28/10/2016
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 24/10/2016

Applicant Details

Applicant name: Shire Pharmaceuticals (Ireland) Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a Biopharmaceutical Manufacturing Facility located at our site at Piercetown, Cradockstown and Ballymagillin Townlands, Dunboyne, County Meath, including the following:- A two storey Biopharmaceutical Production Building sized 17,445 square metres in total and 19.5 metres high with roof mounted plant and equipment. This building will be built in 2 Phases. Phase 1 is sized 13,989 square metres and Phase 2 is sized 3,456 square metres. A two storey Warehouse Facility sized 8,517 square metres in total and 17.2 metres high with roof mounted plant and equipment and associated docking and yard areas. This building is to be built in 2 Phases. Phase 1 is sized 7,627 square metres and Phase 2 is sized 890 square metres. A single storey combined utility building sized 3,995 square metres and 10.4 metres high with internal mezzanines and with roof mounted plant and equipment including 8 no. boiler stacks 22.5 metres high. A three storey laboratory and administration building sized 12,453 square metres and 22 metres high including roof mounted penthouse and plant and equipment. A permanent staff and visitor car park for 496 cars and a temporary construction related car park for 420 cars. The temporary car park will be decommissioned upon completion of the facility. A single storey link building sized 1,751 square metres and 12.4 metres high. Ancillary site works include a bunded tank farm, water and waste water and oil storage tanks, pipe bridges, cooling towers, gas storage facilities, emergency generators, a waste recycling compound and structure, items of plant and equipment and their associated yards, internal roads and services, fencing, exterior lighting, landscaping and landscape berms, surface water attenuation ponds and building mounted and ground mounted signage. Ancillary site buildings include a single storey sprinkler pump house sized 91 square metres and 6.2 metres high and associated tanks, a single storey electrical building sized 65 square metres and 6.2 metres high, a single storey waste water pump house sized 7 square metres and 3.2 metres high, a gas reducing station and compound, a covered bicycle facility for 100 bicycles and 3 no. flagpoles 15 metres high, and a single storey bunded drum storage building sized 122 square metres and 6.2 metres high and a single storey waste water building sized 60 square metres and 6.2 metres high. Site access works including a new main truck and car entrance incorporating a ....
Development Address: Piercetown, Craddockstown and Ballymagillin Townlands, Dunboyne, County Meath
Architect Name: Gerry Loughrey Location Key: PIERCETOWN
Electoral Division: Incorrect Icl Voter Recor Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 28/10/2016 Manager Order: R1202/16
Decision Type: Conditional Number of Conditions: 20
Grant Date: 30/11/2016 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 29/11/2026
Decision Description: a Biopharmaceutical Manufacturing Facility located at our site at Piercetown, Cradockstown and Ballymagillin Townlands, Dunboyne, County Meath, including the following:- A two storey Biopharmaceutical Production Building sized 17,445 square metres in total and 19.5 metres high with roof mounted plant and equipment. This building will be built in 2 Phases. Phase 1 is sized 13,989 square metres and Phase 2 is sized 3,456 square metres. A two storey Warehouse Facility sized 8,517 square metres in total and 17.2 metres high with roof mounted plant and equipment and associated docking and yard areas. This building is to be built in 2 Phases. Phase 1 is sized 7,627 square metres and Phase 2 is sized 890 square metres. A single storey combined utility building sized 3,995 square metres and 10.4 metres high with internal mezzanines and with roof mounted plant and equipment including 8 no. boiler stacks 22.5 metres high. A three storey laboratory and administration building sized 12,453 square metres and 22 metres high including roof mounted penthouse and plant and equipment. A permanent staff and visitor car park for 496 cars and a temporary construction related car park for 420 cars. The temporary car park will be decommissioned upon completion of the facility. A single storey link building sized 1,751 square metres and 12.4 metres high. Ancillary site works include a bunded tank farm, water and waste water and oil storage tanks, pipe bridges, cooling towers, gas storage facilities, emergency generators, a waste recycling compound and structure, items of plant and equipment and their associated yards, internal roads and services, fencing, exterior lighting, landscaping and landscape berms, surface water attenuation ponds and building mounted and ground mounted signage. Ancillary site buildings include a single storey sprinkler pump house sized 91 square metres and 6.2 metres high and associated tanks, a single storey electrical building sized 65 square metres and 6.2 metres high, a single storey waste water pump house sized 7 square metres and 3.2 metres high, a gas reducing station and compound, a covered bicycle facility for 100 bicycles and 3 no. flagpoles 15 metres high, and a single storey bunded drum storage building sized 122 square metres and 6.2 metres high and a single storey waste water building sized 60 square metres and 6.2 metres high. Site access works including a new main truck and car entrance incorporating a ....

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: