Planning Application: 15189 (Kildare County Council )
File Number:
15189
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
16/03/2015
Decision Due Date:
12/07/2016
Validated Date:
16/03/2015
Invalidated Date:
Further Info Requested:
07/05/2015
Further Info Received:
18/05/2016
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
12/07/2016
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Kilsaran Concrete
Applicant Address:
Phone Number:
Fax Number:
23922286
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Inert soil & stone / construction and demolition waste recovery facility as revised by significant further information consisting of the lifetime of the development being for a 6 year period
Development Address:
Halverstown, Kilcullen, Co. Kildare
Architect Name:
Location Key:
KILCULLEN
Electoral Division:
Planner:
Elaine Donohoe
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Yes
Comments:
EIS Submitted through Article 103 notice issued by KCC
Decision
Decision Date:
12/07/2016
Manager Order:
CE7306
Decision Type:
Conditional
Number of Conditions:
37
Grant Date:
06/09/2016
Grant Managers Order #:
CE7306
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
05/09/2021
Decision Description:
Inert soil & stone / construction and demolition waste recovery facility as revised by significant further information consisting of the lifetime of the of the development being for a 6 year period
(i) establishment of an inert soil waste recovery facility to provide for the importation of approximately 1,200,000 tonnes of natural inert waste materials, principally excess soil, stone and / or broken rock to backfill the pit void to former ground level and improve lands currently in agricultural use. The development will be carried out on a phased basis and will be completed within 8 years; (ii) share use, with the existing Kilsaran concrete manufacturing and waste facilities, of existing site and services infrastructure including site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access; (iii) use of section of existing concrete block curing shed as a waste inspection and quarantine facility; and (iv) temporary stockpiling of topsoil pending re-use as cover material for final restoration of the site. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Statement (now referred to as an Environmental Impact Assessment Report (EIRA)) will be submitted