File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
0177 |
APPLICATION FINALISED |
PERMISSION |
C |
09/02/2001 Friday |
CATHAL BOYLE |
CORNACAHAN KILLYBEGS
|
CONSTRUCTION OF A SMALL WIND FARM AND ANCILLARY WORKS, CONSISTING OF THREE 850KW TURBINES, ACCESS ROADS, A CONTROL BUILDING AND AN ESB COMPOUND. |
03645 |
APPLICATION FINALISED |
PERMISSION |
R |
25/07/2003 Friday |
AIROSHIN WIND ENERGY LIMITED |
MEENACHULLALAN & CULLION KILLYBEGS |
ERECTION OF 14 NO. WIND TURBINES, 7 NO. 60M HUB HEIGHT AND 7 NO. 49M HUB HEIGHT AND 52M ROTOR DIAMETER, ACCESS TRACKWAYS 4.5M IN WIDTH, A 38KV SUB STATION BUILDING, STONE QUARRY OF 0.1 HECTARE, A METREOLOGICAL MEASURING MAST, 40M IN HEIGHT AND ASSOCIATED SITE DEVELOPMENT WORKS |
031053 |
APPLICATION FINALISED |
PERMISSION |
C |
02/12/2003 Tuesday |
AIROSHIN WIND ENERGY LIMITED |
MEENACHULLALAN & CULLION KILLYBEGS |
CONSTRUCTION OF 14NO. WIND TURBINES, 7NNO. 60 METER HUB HEIGHT AND 7NO. 49 METER HUG HEIGHT AND 52 METER ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METRES IN WIDTH, A 38 KV SUBSTATION BUILDING, A STONE QUARRY OF 0.1 HEATARE, A METEROLOGICAL MEASURING MAST 40 METRES IN HEIGHT AND ASSOCIATED SITE DEVELOPMENT WORKS |
0520729 |
INCOMPLETED APPLICATION |
PERMISSION |
|
21/12/2005 Wednesday |
CATHAL BOYLE |
CORNACHAN KILLYBEGS |
RELOCATION OF 3 NO. WIND TURBINES WITH REALIGNMENT OF ACCESS ROADWAY AND AMENDED SITE BOUNDARY WHICH CONSTITUTES AN AMENDMENT TO GRANT OF PERMISSION REF. NO. 01/77 |
0620010 |
APPLICATION FINALISED |
PERMISSION |
C |
10/01/2006 Tuesday |
CATHAL BOYLE |
CORNACAHAN KILLYBEGS |
RELOCATION OF 3 NO WIND TURBINES WITH REALIGNMENT OF ACCESS ROADWAY AND AMENDED SITE BOUNDARY WHICH CONSTITUTES AN AMENDMENT TO GRANT OF PERMISSION REF NO. 01/77 |
1950132 |
APPLICATION FINALISED |
PERMISSION |
R |
06/02/2019 Wednesday |
CATHAL BOYLE |
CORNACAHAN AND CUNLIN KILLYBEGS DONEGAL P.O. |
CONSTRUCTION OF ONE WIND TURBINE COMPRISING TOWER, NACELLE, AND ROTOR BLADES WITH A TOWER HEIGHT OF UP TO 67M METRES, A ROTOR BLADE DIAMETER OF UP TO 115.7 METRES AND AN OVERALL TIP HEIGHT OF UP TO 124.5 METRES. THE PROPOSED DEVELOPMENT INCLUDES A WIND TURBINE, TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, SITE ACCESS TRACK, ASSOCIATED DRAINAGE WORKS, UNDERGROUND ELECTRICAL CABLE, 20kV ESB/IPP SUBSTATION AND ASSOCIATED SITE WORKS |
2251214 |
APPLICATION FINALISED |
PERMISSION |
R |
15/07/2022 Friday |
CATHAL BOYLE |
CORNACAHAN AND CUNLIN KILLYBEGS DONEGAL PO |
(1) CONSTRUCTION OF (A) ONE ENERCON E138 WIND TURBINE ON AN 81M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 149.38 (B) THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA (C) AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE (2) DEVELOPMENT OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE (3) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS |