RELOCATION OF 3 NO. WIND TURBINES WITH REALIGNMENT OF ACCESS ROADWAY AND AMENDED SITE BOUNDARY WHICH CONSTITUTES AN AMENDMENT TO GRANT OF PERMISSION REF. NO. 01/77
CONSTRUCTION OF ONE WIND TURBINE COMPRISING TOWER, NACELLE, AND ROTOR BLADES WITH A TOWER HEIGHT OF UP TO 67M METRES, A ROTOR BLADE DIAMETER OF UP TO 115.7 METRES AND AN OVERALL TIP HEIGHT OF UP TO 124.5 METRES. THE PROPOSED DEVELOPMENT INCLUDES A WIND TURBINE, TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, SITE ACCESS TRACK, ASSOCIATED DRAINAGE WORKS, UNDERGROUND ELECTRICAL CABLE, 20kV ESB/IPP SUBSTATION AND ASSOCIATED SITE WORKS
(A) CONSTRUCTION OF ONE ENERCON E138 WIND TURBINE ON A 99M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 169M, (B) THE CONSTRUCTION OF WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, (C) PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE, (D) CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS