03198 |
APPLICATION FINALISED |
PERMISSION |
C |
28/02/2003 Friday |
Merck Sharp & Dohme |
Ballydine Kilsheelan Clonmel |
a proposed single storey extension to the existing mens locker room of the employee services building. The proposed extension will extend northwards and westwards from the existing building and will occupy an area of 358sq metres. |
05864 |
APPLICATION FINALISED |
PERMISSION |
C |
01/07/2005 Friday |
Merck Sharp & Dohme (Ireland) |
Ballydine Kilsheelan Clonmel |
construction of a new single storey extension to the north of the existing Dry End building Factory 01 and the associated site works including the demolition and refurbishment of the interior of the existing locker room and supervisor's office at their existing facility |
20435 |
APPLICATION FINALISED |
PERMISSION |
C |
05/05/2020 Tuesday |
MSD Ireland (Ballydine) |
Ballydine Kilsheelan Co. Tipperary |
the extension of our existing carparking facilities to accommodate the construction of 80 no. new carparking spaces, and the alteration of our existing carparking facilities to accommodate the designation of 4 no. disabled carparking spaces and 8 no. E-car charging carparking spaces, together with all necessary alterations to accommodate the works, and complete with all associated site works and ancillary accommodation the works, and complete with all associated site works and ancillary accommodation. This application refers to a development on a site that carries out an activity for which an Industrial Emissions License under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and where the Major Accident Directive applies |
21407 |
APPLICATION FINALISED |
PERMISSION |
C |
30/03/2021 Tuesday |
MSD Ireland (Ballydine) |
Ballydine Kilsheelan Clonmel |
construction of a proposed three-storey pilot plant manufacturing facility sized approximately 3,266 square metres and approximately 20.75 metres high and located and linked to the existing factory 03 manufacturing building and located south of the O.S.D. manufacturing facility, currently under construction (ref. 20/693). The project development alos includes the following: a) An equipment yard housing plant, equipment and abatement system, vents and equipment housings including a covered waste tank, b) Roof mounted equipment and vents, c) Modifications to existing underground utilities including a surface water attenuation tank, underground storage tanks and miscellaneous works, d) The extension of the temporary contractors’ compound, currently under construction and additional local temporary contractor parking together with a second compound directly adjacent to the proposed facility, e) Revised landscaping and site-works, f) Modifications to the existing internal roads layouts, site lighting, pipe bridges, links, bunded tanks and supporting structures, and a truck staging area, g) Modifications to the existing car park layout to allow for the inclusion of additional accessible car parking spaces and electrical charge points, h) Alterations to the elevations of Factory 03 to accommodate the proposed development. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application. This is a site to which the Chemicals Act (Control of Major Accident Hazards involving dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies |
23196 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
13/07/2023 Thursday |
MSD Ireland (Ballydine) |
Ballydine Kilsheelan Co. Tipperary |
the existing temporary carpark (contractor carpark facility) and associated existing service roadway and existing compound area, comprising a mix of existing stone base and also tarmac surface treatment, and including existing site lighting installations, existing fencing, existing smoking shelter and existing bicycle rack. We also wish to apply for permission to extend the existing carpark by circa 2m to the east to accommodate the construction of 178 no permanent carparking spaces (which includes for the designation of 17 no. new e-car charging carparking spaces and 1 no. new combined disabled/e-car charging carparking space), upgrade of the existing surface finish to a tarmac finish as applicable throughout, installation of line markings and kerbing, drainage works including the installation of a petrol/oil interceptor and attenuation system, adaption of existing site lighting as required ( including the replacement of all existing site lighting fixtures), the alterations of existing tree line, adaptation of existing compound area to form a secure delivery drop-off/short-term storage area, and all necessary alterations to accommodate the above works, complete with all associated site works and ancillary accommodation. The planning application is accompanied by a Natura Impact Statement (NIS). This application refers to a development on a site that carries out activity for which an industrial Emissions Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and where the major accident directive applies |