Planning Application: 201028 (Tipperary County Council )
File Number:
201028
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
11/09/2020
Decision Due Date:
05/11/2020
Validated Date:
11/09/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
30/10/2020
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
15/10/2020
Applicant Details
Applicant name:
Gas Networks Ireland (GNI)
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the replacement of approximately 100m of existing 2.4m high chainlink perimeter fencing, including associated access/emergency gates with new 2.4m green palisade security fencing/gates and all associated site works to an existing above ground natural gas installation. The application refers to a development on a site that carries out an activity for which an Industrial Emissions License under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and where the Major Accident Directive applies
the replacement of approximately 100m of existing 2.4m high chainlink perimeter fencing, including associated access/emergency gates with new 2.4m green palisade security fencing/gates and all associated site works to an existing above ground natural gas installation. The application refers to a development on a site that carries out an activity for which an Industrial Emissions License under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and where the Major Accident Directive applies
a proposed single storey extension to the existing mens locker room of the employee services building. The proposed extension will extend northwards and westwards from the existing building and will occupy an area of 358sq metres.
construction of a new single storey extension to the north of the existing Dry End building Factory 01 and the associated site works including the demolition and refurbishment of the interior of the existing locker room and supervisor's office at their existing facility