Planning application details ref: 081212 Tipperary County Council

100%100% Complete (warning)

Planning Application: 081212 (Tipperary County Council )
File Number: 081212
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 28/10/2008 Decision Due Date: 22/12/2008
Validated Date: 28/10/2008 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 22/12/2008
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Merck Sharpe & Dohme (Ireland ) Ltd
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a life of 10 years to construct and operate a new conference facility, located North of the existing Engineering Building, comprises a new single storey Conference Building (floor area 576 m sq approx) including conference and meeting rooms, offices and other ancillary functional areas within the building, external footpaths and ramps, underground drainage, water supply and sitewide utility system, modifications to the existing and provision of new site security fencing and landscaping, application relates to development consisting to modifications to an establishment within the meaning of Part 11 of the planning Regulations (Major Accident Directive), application relates to a development for the purposes of an activity requiring an integrated pollution prevention and control (IPPC) licence
Development Address: Ballydine, Kilsheelan, Co Tipperary
Architect Name: Location Key: KILSHEELAN
Electoral Division: Kilmurry (Pt.Of) Planner: Jonathan Flood
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 22/12/2008 Manager Order:
Decision Type: Conditional Number of Conditions: 4
Downloads a Microsoft Word Document (Document Size 62 Kb)

Download a Free Word viewer
Grant Date: 03/02/2009 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 02/02/2014
Decision Description: a life of 10 years to construct and operate a new conference facility, located North of the existing Engineering Building, comprises a new single storey Conference Building (floor area 576 m sq approx) including conference and meeting rooms, offices and other ancillary functional areas within the building, external footpaths and ramps, underground drainage, water supply and sitewide utility system, modifications to the existing and provision of new site security fencing and landscaping, application relates to development consisting to modifications to an establishment within the meaning of Part 11 of the planning Regulations (Major Accident Directive), application relates to a development for the purposes of an activity requiring an integrated pollution prevention and control (IPPC) licence

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: