|
|||
---|---|---|---|
File Number: | 08638 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 09/07/2008 | Decision Due Date: | 02/09/2008 |
Validated Date: | 09/07/2008 | Invalidated Date: | |
Further Info Requested: | Further Info Received: | ||
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 02/09/2008 |
Leave to Appeal: | Appeal Date: | ||
Commenced Date: | Submissions By: |
Applicant Details |
|||
---|---|---|---|
Applicant name: | EIRGRID PLC | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | ALTERATION OF ROUTE OF PROPOSED 110KV LINE, WHICH HAS PREVIOUSLY RECEIVED PLANNING PERMISSION (REF NO. 06/1106). THE PROPOSED ROUTE ALTERATION COMPRISES OF THE REPOSITIONING OF WOODPOLE STRUCTURES ALONG THE LINE ROUTE ON THE FINAL 2.2 KILOMETRES INTO THORNSBERRY 110KV STATION AND THE REALIGNMENT OF THE FINAL 400M APPROXIMATELY INTO THORNSBERRY 110KV STATION. THE LINE WILL BE ERECTED OVER OR IN THE VICINITY OF THE TOWNLANDS OF DERRYNAGALL OR BALLYDALY, BALLYCOSNEY AND CORNDARRAGH. THE 110KV LINE WILL CONSIST OF THREE OVERHEAD WIRES AND TWO OVERHEAD SHIELD WIRES. WIRES WILL BE SUPPORTED OVER GROUND ON DOUBLE WOOD POLE STRUCTURES, WHOSE POLES ARE FIVE METRES APART AND HAVE AN AVERAGE HEIGHT OF 22 METRES. WHERE THE LINE CHANGES DIRECTION AND/OR TERMINATES, THE WIRES WILL BE SUPPORTED BY LATTICE STEEL TOWERS OF AVERAGE HEIGHT 20 METRES AND WITH AN AVERAGE BASE AREA OF 6 METRES SQUARE. THE AVERAGE DISTANCE BETWEEN STRUCTURES WILL BE APPROXIMATELY 190 METRES | ||
Development Address: | DERRYNAGALL OR BALLYDALY, BALLYCOSNEY AND CORNDARRAGH | ||
Architect Name: | Location Key: | DERRYNAGALL OR BALLYDALY | |
Electoral Division: | Planner: | Breda Maher | |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | No | Waste Licence Required: | No |
Protected Structure: | No | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | Comments: |
Decision |
|||
---|---|---|---|
Decision Date: | 02/09/2008 | Manager Order: | |
Decision Type: | Conditional | Number of Conditions: | 4 |
Grant Date: | 09/10/2008 | Grant Managers Order #: | |
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 08/10/2013 | ||
Decision Description: | ALTERATION OF ROUTE OF PROPOSED 110KV LINE, WHICH HAS PREVIOUSLY RECEIVED PLANNING PERMISSION (REF NO. 06/1106). THE PROPOSED ROUTE ALTERATION COMPRISES OF THE REPOSITIONING OF WOODPOLE STRUCTURES ALONG THE LINE ROUTE ON THE FINAL 2.2 KILOMETRES INTO THORNSBERRY 110KV STATION AND THE REALIGNMENT OF THE FINAL 400M APPROXIMATELY INTO THORNSBERRY 110KV STATION. THE LINE WILL BE ERECTED OVER OR IN THE VICINITY OF THE TOWNLANDS OF DERRYNAGALL OR BALLYDALY, BALLYCOSNEY AND CORNDARRAGH. THE 110KV LINE WILL CONSIST OF THREE OVERHEAD WIRES AND TWO OVERHEAD SHIELD WIRES. WIRES WILL BE SUPPORTED OVER GROUND ON DOUBLE WOOD POLE STRUCTURES, WHOSE POLES ARE FIVE METRES APART AND HAVE AN AVERAGE HEIGHT OF 22 METRES. WHERE THE LINE CHANGES DIRECTION AND/OR TERMINATES, THE WIRES WILL BE SUPPORTED BY LATTICE STEEL TOWERS OF AVERAGE HEIGHT 20 METRES AND WITH AN AVERAGE BASE AREA OF 6 METRES SQUARE. THE AVERAGE DISTANCE BETWEEN STRUCTURES WILL BE APPROXIMATELY 190 METRES |
Appeal Details | |||
---|---|---|---|
Notification Date: | BP Reference #: | ||
Appeal Type: | File Forward Date: | ||
Submission Due Date: | Submission Sent Date: | ||
Appeal Decision: | Decision Date: | ||
Withdrawn Date: | Dismissed Date: | ||
Reason: |