Planning application details ref: 18139

100%100% Complete (warning)



File Number 18139
Application Type PERMISSION Planning Status APPLICATION FINALISED
Received Date 28/06/2018 Decision Due Date 22/08/2018
Validated Date 28/06/2018 Invalidated Date
Further Info Requested Further Info Received
Withdrawn Date Extend Date
Decision Type Conditional Decision Date 21/08/2018
Leave to Appeal Appeal Date
Commenced Date Submissions By 01/08/2018

Applicant Details

Applicant name Eirgrid Plc. c/o Stephen Dunne
Applicant address
Phone Number Fax Number
Corresp. Address

Applicant Details


Proposed Development

Development Description development at this site - the existing Cloon to Lanesboro 110 kV Overhead Line is approximately 65 kilometres long. Approximately 37km of the existing circuit is located within the functional area of Galway County Council with approximately 27km located in County Roscommon and approximately 120 metres located in County Longford. The refurbishment works within County Longford will be undertaken at structure EM365, located within the Lanesboro Substation in the townland of Aghamore (Rathcline By). The development will consist of the refurbishment of the Cloon - Lanesboro 110 kV Overhead Line which will primarily include: replacement of a large proportion of existing structures, the breaking out and reconstruction of the concrete foundation and shear blocks at the majority of end/angle mast structures, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures; and the fitting of bird flight diverters and stay guards. No additional structures are proposed along the existing circuit. Any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, and will be of a generally similar height and appearance. Associated site development works to gain access to the existing structures include clearance of vegetation, disassembly and reassembly of stone walls and gate posts and removal and reinstatement of existing fencing. The proposed development includes all other associated and ancillary site development works required for the refurbishment of the existing circuit, including the installation of temporary silt traps, silt fences, bog mats and clear span bridges. No additional structures and no alteration to the nature, extent, alignment, character or voltage of the existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) forms part of this application
Development Address Aghamore (Rathcline By),, Co. Longford.
Architect Name Location Key AGHAMORE
Electoral Division Planner None
Social Housing Exempt Plan Enforcement #
IPC IPC Licence Required No Waste Licence Required No
Protected Structure No Protected Structure #
Development Name

Proposed Development


Comments

Significant Case Flag Comments

Decision

Decision Date 21/08/2018 Manager Order 28175
Decision Type Conditional Number of Conditions 7
Grant Date 27/09/2018 Grant Managers Order # 28175
Section 47 Apply? Part 5 Apply?
Expiry Date 26/09/2023
Decision Description development at this site - the existing Cloon to Lanesboro 110 kV Overhead Line is approximately 65 kilometres long. Approximately 37km of the existing circuit is located within the functional area of Galway County Council with approximately 27km located in County Roscommon and approximately 120 metres located in County Longford. The refurbishment works within County Longford will be undertaken at structure EM365, located within the Lanesboro Substation in the townland of Aghamore (Rathcline By). The development will consist of the refurbishment of the Cloon - Lanesboro 110 kV Overhead Line which will primarily include: replacement of a large proportion of existing structures, the breaking out and reconstruction of the concrete foundation and shear blocks at the majority of end/angle mast structures, painting of mast structures, replacement of insulators, crossarms, stays and/or fittings on existing structures; and the fitting of bird flight diverters and stay guards. No additional structures are proposed along the existing circuit. Any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, and will be of a generally similar height and appearance. Associated site development works to gain access to the existing structures include clearance of vegetation, disassembly and reassembly of stone walls and gate posts and removal and reinstatement of existing fencing. The proposed development includes all other associated and ancillary site development works required for the refurbishment of the existing circuit, including the installation of temporary silt traps, silt fences, bog mats and clear span bridges. No additional structures and no alteration to the nature, extent, alignment, character or voltage of the existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) forms part of this application

Appeal Details


Appeal Details
Notification Date BP Reference #
Appeal Type File Forward Date
Submission Due Date Submission Sent Date
Appeal Decision Decision Date
Withdrawn Date Dismissed Date
Reason