|
|||
---|---|---|---|
File Number: | 2460274 | ||
Application Type: | PERMISSION | Planning Status: | APPLICATION FINALISED |
Received Date: | 22/05/2024 | Decision Due Date: | 16/07/2024 |
Validated Date: | 22/05/2024 | Invalidated Date: | |
Further Info Requested: | Further Info Received: | ||
Withdrawn Date: | Extend Date: | ||
Decision Type: | Conditional | Decision Date: | 11/07/2024 |
Leave to Appeal: | Appeal Date: | ||
Commenced Date: | Submissions By: | 25/06/2024 |
Applicant Details |
|||
---|---|---|---|
Applicant name: | Christopher Nicholson | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | for 1;Proposed restoration works to Ballynatray House, a PROTECTED STRUCTURE, Works to include: External fabric repairs to the roof and elevations, including rebuilding stone chimneys, replacement of cement finishes with lime render and limestone, removal of non-historic external staircase, replacement of non-historic windows with new sash windows. Internal works include new M&E installation, new lime silicate insulation board to internal face of external walls. 2: Restoration of 2no main gate Gatehouses. Works to include: Reinstatement of lead mono-pitch roof, replacement of cement finishes with lime render, reinstatement of timber sash windows, new M&E installation, new lime silicate insulation board to internal face of external walls, new wrought iron gates to match existing. 3: Restoration of 2no derelict Gatehouses at Glendine gates. Works to include: Reinstatement of lead mono-pitch roof, new lime render exterior, new timber doors and sash windows, new cast aluminium rain water goods, new concrete floor, M&E installation, new lime silicate insulation board to internal face of external walls, new internal finishes, replacement of timber gates with wrought iron gates. 4: Restoration of West Barn as energy centre. Works to include: Replacement of metal roof with new natural slated roof on new roof structure, and associated flashings and rainwater goods. Reconstruction of west wall in rubble stone to match existing, with 4no new arched door openings, new glazed and timber double doors. New windows and doors to east elevation, new lime silicate insulation board to internal face of external walls, new concrete floor slab throughout, new M&E installation, internal finishes and fittings throughout. The gate houses and west barn are located within the curtilage of a PROTECTED STRUCTURE. | ||
Development Address: | Ballynatray House, Ballynatray Estate, Youghal Co. Waterford, P36 T678 | ||
Architect Name: | Location Key: | BALLYNATRAY | |
Electoral Division: | Planner: | Aidan Walsh | |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | No | Waste Licence Required: | No |
Protected Structure: | Yes | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | Comments: |
Decision |
|||
---|---|---|---|
Decision Date: | 11/07/2024 | Manager Order: | 2024/2121 |
Decision Type: | Conditional | Number of Conditions: | 7 |
Grant Date: | 15/08/2024 | Grant Managers Order #: | |
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 14/08/2029 | ||
Decision Description: | for 1;Proposed restoration works to Ballynatray House, a PROTECTED STRUCTURE, Works to include: External fabric repairs to the roof and elevations, including rebuilding stone chimneys, replacement of cement finishes with lime render and limestone, removal of non-historic external staircase, replacement of non-historic windows with new sash windows. Internal works include new M&E installation, new lime silicate insulation board to internal face of external walls. 2: Restoration of 2no main gate Gatehouses. Works to include: Reinstatement of lead mono-pitch roof, replacement of cement finishes with lime render, reinstatement of timber sash windows, new M&E installation, new lime silicate insulation board to internal face of external walls, new wrought iron gates to match existing. 3: Restoration of 2no derelict Gatehouses at Glendine gates. Works to include: Reinstatement of lead mono-pitch roof, new lime render exterior, new timber doors and sash windows, new cast aluminium rain water goods, new concrete floor, M&E installation, new lime silicate insulation board to internal face of external walls, new internal finishes, replacement of timber gates with wrought iron gates. 4: Restoration of West Barn as energy centre. Works to include: Replacement of metal roof with new natural slated roof on new roof structure, and associated flashings and rainwater goods. Reconstruction of west wall in rubble stone to match existing, with 4no new arched door openings, new glazed and timber double doors. New windows and doors to east elevation, new lime silicate insulation board to internal face of external walls, new concrete floor slab throughout, new M&E installation, internal finishes and fittings throughout. The gate houses and west barn are located within the curtilage of a PROTECTED STRUCTURE. |
Appeal Details | |||
---|---|---|---|
Notification Date: | BP Reference #: | ||
Appeal Type: | File Forward Date: | ||
Submission Due Date: | Submission Sent Date: | ||
Appeal Decision: | Decision Date: | ||
Withdrawn Date: | Dismissed Date: | ||
Reason: |