File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
06510773 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2006 Wednesday |
Anglo American Lisheen Mining Ltd., |
Barnalisheen, Cooleeny, Derryfada, Derryville and Killoran |
wind turbine farm consisting of 22 No. wind turbine generators, access roads, craneage pads and associated infrastructure. An Environmental Impact Statement will be submitted to the Planning Authority with this Application |
12510034 |
APPLICATION FINALISED |
PERMISSION |
C |
31/01/2012 Tuesday |
Lisheen Mine |
Derryville Moyne Templetuohy |
develop the Derryville Island Ore Deposit underground workings as an extension to the existing Lisheen Mine and the construction of 1 No. ventilation shaft. The Lisheen Mine is subject to the conditions of IPPCL No. P0099-03. The development will include underground mine workings, as an extension to the existing Lisheen Mine and the construction of 1 No. ventilation shaft and associated surface building. An EIS shall be submitted to the planning authority with the application. The Major Accident Regulations apply to the proposed development. |
13510275 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2013 Thursday |
Lisheen Milling Limited |
Killoran Thurles Co. Tipperary |
consisting of modification of the permitted water impoundment facility (permitted under An Bord Pleanala Ref. No. PL22.100093 (North Tipperary County Council Reg. Ref. PLC17663) including use of the facility to provide for the storage and management of mine tailings within the same structure (for the purposes of extending life of mine), and associated capping and reinstatement activities. The proposed development also includes: the installation of spigots and reclaim pumps; and all other ancillary site development works. An Environmental Impact Statement (EIS) and Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the Planning Application. The application relates to development which comprises, or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence under the Environmental Protection Agency Acts, 1992 to 2013 (EPA Licence Reg. No. P0088-03) |
14600396 |
APPLICATION FINALISED |
PERMISSION |
C |
29/10/2014 Wednesday |
Lisheen Milling Limited |
Killoran Moyne, Thurles Co. Tipperary |
an increase in height of the existing Tailings Management Facility (TMF), previously permitted under Reg. No. 13/510275, granted in 2013 (small adjoining cell to the main TMF). The raise in height of this adjoining cell, from c. 131.5 mod up to aa maximum of c. 136.5 mod, will provide additional storage for the management of mine tailings for the purposes of extending the life of the mine, abd will result in an increase in the footprint of the TMF of c 2.25 hectares. The development also includes all related ancillary development works. This application is accompanied by an Environmental Impact Statement(EIS) & Natura Impact Statement(NIS) and relates to an activity requiring an Integrated Pollution Control Licence |
2460936 |
NEW APPLICATION |
PERMISSION |
|
02/11/2024 Saturday |
|
Former Lisheen Mine Site Killoran, Moyne Thurles, Co. Tipperary |
construction of an anaerobic digestion plant comprising: 4 no. primary digester tanks (each measuring c. 7.6 m in height); 3 no. secondary digester tanks (each measuring c. 14.5 m in height); 4 no. feed hoppers; 4 no. technical rooms (ranging in size from c. 35 sq m to c. 95 sq m GFA); 2 no. biogas conditioning units; process, storage and buffer tanks (comprising: 1 no. buffer digestate storage tank (c. 7.5 m in height), 1 no. suspension buffer tank (c. 8 m in height), 1 no. process area runoff storage tank (c. 4.5 m in height); 1 no. buffer digestate process tank (c. 4.5 m in height), 1 no. treated digestate liquids recycle storage tank (c. 4.5 m in height); 1
no. roofed liquids feed-mix tank (c. 3 m in height)); these components will be located within a containment bund constructed c. 3 m below ground level.
The proposed development will also consist of: feedstock storage (comprising 3 no. storage clamps (c. 1,050 sq m in area each) and 2 no. storage sheds (c. 500 sq m GFA each)); a biomethane upgrading plant (including natural gas compression unit); a biomethane loading facility (comprising 4 no. loading bays with associated gates and safety features measuring c. 490 sq m in area); a biomass boiler with its associated pellet storage silo (c. 12.5 m in height); Combined Heat and Power (CHP) plant and associated heat exchanger; a single storey bio-based fertiliser processing and storage unit (c. 3,890 sq m GFA) (including digestate dewatering plant, fertiliser pasteurisation plant and bio-based fertiliser loading facilities); a single storey office building (c. 105 sq m GFA) (including offices, meeting room, control room, laboratory, welfare facilities, storeroom and a first-aid facility); bin storage; 9 no. car parking spaces (including 5 no. standard parking spaces, 2 no. electric vehicle (EV) spaces and 1 no. accessible car parking space); electric vehicle (EV) charging infrastructure; 10 no. bicycle parking spaces; vehicular, cyclist and pedestrian access / egress and associated circulation routes; 2 no. weighbridges; a vehicle steam wash area; fuel storage tank and associated bund; an emergency flare (c. 7.6 m in height); a process area runoff lagoon; an attenuation pond; an ESB sub-station; boundary treatments [including gates, piers and fencing]; site lighting; all hard and soft landscaping; provision of sustainable urban drainage systems (SUDS); and all other associated site excavation, infrastructural and all other associated site excavation, infrastructural and site development works above and below ground, including changes in level and associated retaining features, and associated site servicing [water and electricity supply]. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted with the application |