Planning application details ref: 2260395 Tipperary County Council

100%100% Complete (warning)

Planning Application: 2260395 (Tipperary County Council )
File Number: 2260395
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 28/07/2022 Decision Due Date: 27/11/2022
Validated Date: 28/07/2022 Invalidated Date:
Further Info Requested: 20/09/2022 Further Info Received: 03/10/2022
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 21/11/2022
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: NaringTech Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a BioEnergy Facility comprising 1 No. biomass boiler building, associated water storage tank, 1 No. materials storage building. The integrated Compost / Growing Media Facility and Anaerobic Digestion Facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the R502, internal access roads and hardstanding, car parking, fire water tank and retention pond, ESB substation and pump house, 4 No. weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. An Environment Impact Assessment Report will be submitted with this application.
Development Address: Derryville, Co. Tipperary, Tipperary, E41R622
Architect Name: Location Key: DERRVILLE
Electoral Division: Planner: MARION CAREY
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: Yes Waste Licence Required: Yes
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 21/11/2022 Manager Order:
Decision Type: Conditional Number of Conditions: 20
Grant Date: 03/01/2023 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 02/01/2028
Decision Description: a 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a BioEnergy Facility comprising 1 No. biomass boiler building, associated water storage tank, 1 No. materials storage building. The integrated Compost / Growing Media Facility and Anaerobic Digestion Facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the R502, internal access roads and hardstanding, car parking, fire water tank and retention pond, ESB substation and pump house, 4 No. weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. An Environment Impact Assessment Report is submitted with this application.

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: