Planning Application: 19601159 (Tipperary County Council )
File Number:
19601159
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
21/10/2019
Decision Due Date:
18/07/2020
Validated Date:
21/10/2019
Invalidated Date:
Further Info Requested:
12/12/2019
Further Info Received:
22/05/2020
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
01/07/2020
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
27/06/2020
Applicant Details
Applicant name:
Engie Developments (Ireland) Ltd.
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
the construction and operation of solar PV arrays mounted on metal frames on a 37.6ha site, inclusive of an electrical substation compound, up to 10 inverter units, a temporary construction area and ancillary facilities, (inclusive of gross floor space of proposed works up to 248 sq.m). The planning application is accompanied by an environmental report and Natura Impact Statement
Development Address:
Ballycarrane, Thurles, Co. Tipperary
Architect Name:
Location Key:
BALLYCURRANE, THURLES
Electoral Division:
Planner:
MARION CAREY
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
9
Comments:
The dates and timelines on this application may be affected by the Emergency Covid-19 legislation.
Decision
Decision Date:
01/07/2020
Manager Order:
Decision Type:
Conditional
Number of Conditions:
17
Grant Date:
04/08/2020
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
03/08/2025
Decision Description:
the construction and operation of solar PV arrays mounted on metal frames on a 37.6ha site, inclusive of an electrical substation compound, up to 10 inverter units, a temporary construction area and ancillary facilities, (inclusive of gross floor space of proposed works up to 248 sq.m). The planning application is accompanied by an environmental report and Natura Impact Statement
1. Demolition of an existing building on site. 2. The erection of a new industrial building approximately 1200 metres squared in size for the purpose of a waste recovery facility with associated site works. 3. The erection of a weighbridge. This application will require a waste licence permit
the construction and operation of solar PV arrays mounted on metal frames on a 37.6ha site, inclusive of an electrical substation compound, up to 10 inverter units, a temporary construction area and ancillary facilities, (inclusive of gross floor space of proposed works up to 248 sq.m). The planning application is accompanied by an environmental report and Natura Impact Statement