Planning Application: 16600971 (Tipperary County Council )
File Number:
16600971
Application Type:
PERMISSION FOR RETENTION
Planning Status:
DECLARED WITHDRAWN
Received Date:
25/10/2016
Decision Due Date:
Validated Date:
25/10/2016
Invalidated Date:
Further Info Requested:
13/12/2016
Further Info Received:
Withdrawn Date:
21/06/2017
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Sustainable Projects Ireland CLG
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Bord na Mona moving bed biological reactor wastewater treatment plant consisting of two stage primary settling tanks, two aerated activated sludge tanks, final settling tank, and flow meter. The development also includes 80mm HDPE rising main from the sewage pumping station and return 80mm treated effluent rising main from the treatment plant to the sewage pumping station, where it connects to the 80mm HDPE rising main to the Tipperary County Council sewer which was approved under previous planning reference 04/51/1649
The creation of a sustainable community. The development will comprise of demolition of the former Lime Tree pub and outbuildings on Main Street and the installation of site infrastructure for 133 mixed residential units and the site services for other associated buildings totalling 1250 q. m., with access from the Main Street and from the Step Road, including roads, public lighting, foul sewer, storm sewer, urine sewer and storage tanks, sludge drying facility and waste water treatment facilities requiring a waste management permit and a license for discharge of sewage effluent
creation of sustainable community. The development will compromise demolition of the former Lime Tree Pub & outbuildings on Main St & construct 133 homes ( includ 20 live-work units) in the form of apartment, terrace, semi-det & det house types. The buildings vary in height from one to three storeys. There will be two community buildings (950 sq. m at 1 - 2 storeys), farm and maintenance buildings (150 sq.m) & craft/enterprise/maintenance building (150 sq.m). Access is by a new street (formed by the demolition of Lime Tree Pub & outbuildings, including barn on main street) & by an upgraded entrance on Step Rd. Landscaping will include relocation of the present field drain and its restoration as a stream ( as a natural water feature), sustainable urban drainage strategies for storm water attenuation, extensive native landscaping. Community outdoor spaces will be provided. The development will include approx. 25 acres of organic farm.
installation of a streetlighting network comprising lighting columns and fixtures above and below ground level and all ancillary works; erection of 2 no. pedestrian footbridges and associated foundations; complete road turning bays and construction of traffic ramps to taken in charge standards; complete road signage and road markings to taken in charge standards; repair of identified existing footpaths/greenways; erection of security fencing around waste water treatment plant; erection of security fencing around sewage pumping station; connection of water main at Step Road entrance and installation of tarmacadam at Step Road entrance; and all ancillary works
No Environment Impact Assesments Associated with this Application